NTISthis.com

Evidence Guide: AURT309140A - Manufacture and install fluid power hose assemblies

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURT309140A - Manufacture and install fluid power hose assemblies

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to manufacture fluid power hose assemblies

  1. Nature and scope of work requirements are identified and confirmed
  2. OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work
  3. Procedures and information such as workshop manuals and specifications, and tooling, are sourced
  4. Method options are analysed and those most appropriate to the circumstances are selected and prepared
  5. Technical and/or installation requirements for hose assemblies are sourced and support equipment is identified and prepared
  6. Warnings in relation to working with fluid power systems are observed
Nature and scope of work requirements are identified and confirmed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures and information such as workshop manuals and specifications, and tooling, are sourced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Method options are analysed and those most appropriate to the circumstances are selected and prepared

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical and/or installation requirements for hose assemblies are sourced and support equipment is identified and prepared

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Warnings in relation to working with fluid power systems are observed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Manufacture fluid power hose assemblies

  1. Methods for manufacture are implemented in accordance with workplace procedures and manufacturer/component supplier specifications
  2. Adjustments made during manufacture are in accordance with manufacturer/component supplier specifications
Methods for manufacture are implemented in accordance with workplace procedures and manufacturer/component supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adjustments made during manufacture are in accordance with manufacturer/component supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install fluid power hose assemblies

  1. OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work
  2. Procedures and information for installation are identified and sourced
  3. Technical and tool requirements for installation are identified and support equipment is identified and prepared
  4. Hose assemblies are installed in accordance with specifications
OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Procedures and information for installation are identified and sourced

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Technical and tool requirements for installation are identified and support equipment is identified and prepared

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hose assemblies are installed in accordance with specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct fluid power hose assembly tests and analyse results

  1. Methods for fluid power hose assembly tests are implemented in accordance with workplace procedures and manufacturer/component supplier specifications
  2. Test results are compared with manufacturer/component supplier specifications to indicate compliance or non-compliance
  3. Results are documented with evidence and supporting information and recommendation(s) made
  4. Report is forwarded to persons for action in accordance with workplace procedures
Methods for fluid power hose assembly tests are implemented in accordance with workplace procedures and manufacturer/component supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Test results are compared with manufacturer/component supplier specifications to indicate compliance or non-compliance

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Results are documented with evidence and supporting information and recommendation(s) made

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Report is forwarded to persons for action in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare fluid power system for use or storage

  1. Documentation following manufacturing procedure is completed
  2. Final inspection is made to ensure safety features are in place
  3. Final inspection is made to ensure work is to workplace expectations
  4. Fluid power system is cleaned for use or storage to workplace expectations
  5. Job card is completed and delivered to appropriate persons
Documentation following manufacturing procedure is completed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final inspection is made to ensure safety features are in place

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final inspection is made to ensure work is to workplace expectations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fluid power system is cleaned for use or storage to workplace expectations

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job card is completed and delivered to appropriate persons

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

It is essential that competence in this unit signifies ability to transfer competence to changing circumstances and to respond to unusual circumstances in the critical aspects of:

observing safety procedures and requirements

communicating effectively with others involved in or affected by the work

selecting methods and techniques appropriate to the circumstances

completing preparatory activity in a systematic manner

manufacturing and installing hose assemblies to manufacturer/component supplier requirements and within workplace timeframes

conducting tests to manufacturer/component supplier requirements

interpreting test results

fluid power system presentation to customer in compliance with workplace requirements

Context of, and specific resources for assessment

Application of competence is to be assessed in the workplace or simulated worksite

Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints

Assessment is to comply with regulatory requirements, including Australian Standards

The following resources should be made available:

workplace location or simulated workplace

material relevant to the manufacture and installation of fluid power hose assemblies

equipment, hand and power tooling appropriate to the manufacture and installation of fluid power hose assemblies

activities covering mandatory task requirements

specifications and work instructions

Method of assessment

Assessment must satisfy the endorsed assessment guidelines of the automotive industry's RS&R Training Package

Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge

Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies

Assessment may be applied under project related conditions and require evidence of process

Assessment must confirm a reasonable inference that competence is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances

It is preferable that assessment reflects a process rather than an event and occurs over a period of time to cover varying quality circumstances. Evidence of performance may be provided by customers, team leaders/members or other persons subject to agreed authentication arrangements

Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role

Guidance information for assessment

Required Skills and Knowledge

Required skills

apply research and interpretive skills sufficient to locate, interpret and apply manufacturer/component supplier procedures, workplace policies and procedures

apply analytical skills for identification and analysis of technical information

apply plain English literacy and communication skills in relation to dealing with customers and team members

apply questioning and active listening skills for example when obtaining information from customers

apply oral communication skills sufficient to convey information and concepts to customers

apply planning and organising skills to own work activities, including making good use of time and resources, sorting out priorities and monitoring own performance

interact effectively with other persons both on a one-to-one basis and in groups, including understanding and responding to the needs of a customer and working effectively as a member of a team to achieve a shared goal

establish safe and effective work processes which anticipate and/or resolve problems and downtime, to systematically develop solutions to avoid or minimise reworking and avoid wastage

use mathematical ideas and techniques to correctly calculate time, assess tolerances, apply accurate measurements, calculate material requirements and establish quality checks

use workplace technology related to the manufacture and installation of fluid power hose assemblies, including the use of specialist tooling, measuring equipment, computerised technology and communication devices and the documenting/ recording of results

Required knowledge

A working knowledge of:

OH&S and environmental regulations/requirements, equipment, material and personal safety requirements

dangers of working with fluid power equipment

operating principles of power systems their relationship to each other

manufacturing procedures

installation procedures

enterprise quality procedures

work organisation and planning processes

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Safety (OH&S)

OH&S requirements are to be in accordance with legislation/regulations/codes of practice and enterprise safety policies and procedures. This may include protective clothing and equipment, use of tooling and equipment, workplace environment and safety, handling of material, use of fire fighting equipment, enterprise first aid, hazard control and hazardous materials and substances

OH&S

Personal protective equipment is to include that prescribed under legislation/regulation/codes of practice and workplace policies and practices

Personal protective equipment

Safe operating procedures are to include, but are not limited to operational risk assessment and treatments associated with vehicular movement, toxic substances, electrical safety, machinery movement and operation, manual and mechanical lifting and shifting, working in proximity to others and site visitors

Safe operating procedures

Emergency procedures related to this unit are to include but may not be limited to emergency shutdown and stopping of equipment, extinguishing fires, enterprise first aid requirements and site evacuation

Emergency procedures

Environmental requirements are to include but are not limited to waste management, noise, dust and clean-up management

Quality requirements

Quality requirements are to include, but are not limited to regulations, including Australian Standards, internal company quality policy and standards and enterprise operations and procedures

Statutory/regulatory authorities

Statutory/regulatory authorities may include Federal, State/Territory and local authorities administering acts, regulations and codes of practice

Tooling and equipment

Tooling and equipment may include hand tooling, meters, gauges and load testing devices

Materials

Materials may include hosing, installations consumables and cleaning materials

Communications

Communications are to include, but are not limited to verbal and visual instructions and fault documenting and may include site specific instructions, written instructions, plans or instructions related to job/task, telephones and pagers

Information/documents

Sources of information/documents may include:

verbal or written and graphical instructions, signage, work schedules/plans/specifications, work bulletins, memos, material safety data sheets, diagrams or sketches

safe work procedures related to manufacture and installation of fluid power hose assemblies

regulatory/legislative requirements pertaining to automotive industry, including Australian Design Rules

engineer's design specifications and instructions

organisation work specifications and requirements

instructions issued by authorised enterprise or external persons

Australian Standards