Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURT325149A - Prepare engineering drawings

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare for work

  1. Work instructions are used to determine the job requirements, including job sheets, preparation procedures and manufacturer/component supplier specifications
  2. Job specifications are read and interpreted
  3. OH&S requirements, including personal protection needs, are observed throughout the work
  4. Product/system/component/item to be drawn is identified
  5. Correct instruments and equipment are identified and checked for safe use
Work instructions are used to determine the job requirements, including job sheets, preparation procedures and manufacturer/component supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Job specifications are read and interpreted

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

OH&S requirements, including personal protection needs, are observed throughout the work

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Product/system/component/item to be drawn is identified

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct instruments and equipment are identified and checked for safe use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare engineering drawing

  1. Correct information is accessed and interpreted from manufacturer/component supplier specifications
  2. Drawing instruments, equipment and materials are selected to match the complexity of the requirement
  3. Symbols, codes, legends and diagrammatic representations are used
  4. Correct dimensions, tolerances and material specifications are used
  5. Engineering drawings are completed and checked for accuracy
  6. Activities are carried out according to industry regulations/guidelines, OH&S legislation, legislation and enterprise procedures/policies
Correct information is accessed and interpreted from manufacturer/component supplier specifications

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawing instruments, equipment and materials are selected to match the complexity of the requirement

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Symbols, codes, legends and diagrammatic representations are used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Correct dimensions, tolerances and material specifications are used

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Engineering drawings are completed and checked for accuracy

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Activities are carried out according to industry regulations/guidelines, OH&S legislation, legislation and enterprise procedures/policies

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up work area and maintain equipment

  1. Waste and scrap is removed following workplace procedure
  2. Equipment and work area are cleaned and inspected for serviceable condition in accordance with workplace procedures
  3. Unserviceable equipment is tagged and faults identified in accordance with workplace procedures
  4. Instruments are maintained and stored in accordance with workplace procedures
Waste and scrap is removed following workplace procedure

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Equipment and work area are cleaned and inspected for serviceable condition in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Unserviceable equipment is tagged and faults identified in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Instruments are maintained and stored in accordance with workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

It is essential that competence is fully observed and there is ability to transfer competence to changing circumstances and to respond to unusual situations in the critical aspects of:

observing safety procedures and requirements

communicating effectively with others involved in or affected by the work

selecting methods and techniques appropriate to the circumstances

completing preparatory activity in a systematic manner

preparing engineering drawings covering manufacture or modification of a minimum of three different products both hand and computer-aided processes

preparing and presenting engineering drawings to customer and enterprise requirements

Context of, and specific resources for assessment

Application of competence is to be assessed in the workplace or simulated worksite

Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints

Assessment is to comply with regulatory requirements, including Australian Standards

The following resources should be made available:

workplace location or simulated workplace

material relevant to the preparation of engineering drawings

equipment, hand and power tooling appropriate to the preparation of engineering drawings

activities covering mandatory task requirements

specifications and work instructions

Method of assessment

Assessment must satisfy the endorsed assessment guidelines of the automotive industry's RS&R Training Package

Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge

Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies

Assessment may be applied under project related conditions and require evidence of process

Assessment must confirm a reasonable inference that competence is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances

It is preferable that assessment reflects a process rather than an event and occurs over a period of time to cover varying quality circumstances. Evidence of performance may be provided by customers, team leaders/members or other persons subject to agreed authentication arrangements

Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role

Guidance information for assessment

Required Skills and Knowledge

Required skills

collect, organise and understand information related to work orders, plans and safety procedures for preparing engineering drawings

communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the documenting of work outcomes and problems

plan and organise activities, including preparation and layout of worksite and obtaining of equipment, materials and drawing instruments to avoid backtracking, workflow interruptions or time wastage

work with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity

use mathematical ideas and techniques to correctly represent unit/object/subject dimensions and specifications

use pre-checking and inspection techniques to anticipate planning and scheduling problems and avoid wastage of time

use workplace technology related to the preparation of engineering drawings, including the use of specialist tooling, measuring equipment, computerised technology and communication devices and the documenting/recording of results

Required knowledge

A working knowledge of:

OH&S regulations/requirements, equipment, material and personal safety requirements

techniques for interpretation of manufacturing/ modification specifications

equipment operating procedures

ISO standards

technical information, including symbols, codes, legends and diagrammatic representations

computer-aided design techniques and applications

engineering drawing procedures

work organisation and planning processes

enterprise quality processes

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Methods

Methods are to include:

hand and instrument drawing

computer-aided drawing

OH&S

OH&S requirements are to be in accordance with legislation/regulations/codes of practice and enterprise safety policies and procedures. This may include protective clothing and equipment, workplace environment and safety and enterprise first aid

Personal protective equipment

Personal protective equipment is to include that prescribed under legislation/regulation/codes of practice and workplace policies and practices

Safe operating procedures

Safe operating procedures are to include, but are not limited to operational risk assessment and treatments associated with site safety, working in proximity to others and site visitors

Emergency procedures

Emergency procedures related to this unit are to include but may not be limited to enterprise first aid requirements and site evacuation

Environmental requirements

Environmental requirements are to include but are not limited to waste management and clean-up management

Quality requirements

Quality requirements are to include, but are not limited to regulations, including Australian Standards, internal company quality policy and standards and enterprise operations and procedures

Statutory/regulatory authorities

Statutory/regulatory authorities may include Federal, State/Territory and local authorities administering acts, regulations and codes of practice

Resources

Resources are to include computers, CAD software, drawing boards, drawing machines, drawing paper and rulers, T-squares, measuring equipment, pens and pencils

Communications

Communications are to include, but are not limited to verbal and visual instructions and may include site specific instructions, written instructions, plans or instructions related to job/task, telephones and pagers

Information/documents

Sources of information/documents may include:

schedules/plans/specifications, memos, material safety data sheets, diagrams or sketches

regulatory/legislative requirements pertaining to automotive industry, including Australian Design Rules

organisation work specifications and requirements

instructions issued by authorised enterprise or external persons

Australian Standards