NTISthis.com

Evidence Guide: AURVTG011 - Install side vehicle windows

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

AURVTG011 - Install side vehicle windows

What evidence can you provide to prove your understanding of each of the following citeria?

Prepare to install side window

  1. Job requirements are determined from workplace instructions
  2. Information is accessed and interpreted from manufacturer specifications, workplace procedures, and sealant safety data sheets (SDS)
  3. Work is planned to minimise waste and use time efficiently
  4. Vehicle is inspected to ensure there is no prior damage and that all related accessories are operating correctly
  5. Materials required to install side window are selected and checked for quality
  6. Hazards associated with the work are identified and risks are managed
  7. Tools and equipment for making opening and installing side window are selected and checked for serviceability
  8. Vehicle is protected and safely located according to workplace procedures
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Information is accessed and interpreted from manufacturer specifications, workplace procedures, and sealant safety data sheets (SDS)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is planned to minimise waste and use time efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vehicle is inspected to ensure there is no prior damage and that all related accessories are operating correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required to install side window are selected and checked for quality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment for making opening and installing side window are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vehicle is protected and safely located according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fabricate templates

  1. Accurate measurements of shape and size of side window are taken in order to prepare templates
  2. Suitable materials and equipment are used to fabricate templates
  3. Templates are completed according to workplace procedures and without causing damage to vehicle or components
Accurate measurements of shape and size of side window are taken in order to prepare templates

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable materials and equipment are used to fabricate templates

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Templates are completed according to workplace procedures and without causing damage to vehicle or components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark out and cut panel for side window

  1. Template is used to mark out areas on vehicle to be cut
  2. Window opening is cut in panel using approved methods and equipment according to workplace procedures and safety and environmental requirements
  3. Panel edges and trim are prepared for installation of side window
  4. Panels and trim are reinforced as required to comply with vehicle manufacturer specifications and without causing damage to vehicle or components
Template is used to mark out areas on vehicle to be cut

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Window opening is cut in panel using approved methods and equipment according to workplace procedures and safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Panel edges and trim are prepared for installation of side window

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Panels and trim are reinforced as required to comply with vehicle manufacturer specifications and without causing damage to vehicle or components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install side window

  1. Material to be installed in vehicle side opening is selected and prepared
  2. Side window is installed to manufacturer specifications using either rubber or direct glazing according to safety and environmental requirements
  3. Window in panel opening is secured using approved materials
Material to be installed in vehicle side opening is selected and prepared

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Side window is installed to manufacturer specifications using either rubber or direct glazing according to safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Window in panel opening is secured using approved materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work meets workplace expectations, related accessories are operating correctly, customer is informed of time to wait before driving vehicle, and vehicle is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
  3. Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work meets workplace expectations, related accessories are operating correctly, customer is informed of time to wait before driving vehicle, and vehicle is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare to install side window

  1. Job requirements are determined from workplace instructions
  2. Information is accessed and interpreted from manufacturer specifications, workplace procedures, and sealant safety data sheets (SDS)
  3. Work is planned to minimise waste and use time efficiently
  4. Vehicle is inspected to ensure there is no prior damage and that all related accessories are operating correctly
  5. Materials required to install side window are selected and checked for quality
  6. Hazards associated with the work are identified and risks are managed
  7. Tools and equipment for making opening and installing side window are selected and checked for serviceability
  8. Vehicle is protected and safely located according to workplace procedures
Job requirements are determined from workplace instructions

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Information is accessed and interpreted from manufacturer specifications, workplace procedures, and sealant safety data sheets (SDS)

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is planned to minimise waste and use time efficiently

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vehicle is inspected to ensure there is no prior damage and that all related accessories are operating correctly

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials required to install side window are selected and checked for quality

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazards associated with the work are identified and risks are managed

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment for making opening and installing side window are selected and checked for serviceability

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vehicle is protected and safely located according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fabricate templates

  1. Accurate measurements of shape and size of side window are taken in order to prepare templates
  2. Suitable materials and equipment are used to fabricate templates
  3. Templates are completed according to workplace procedures and without causing damage to vehicle or components
Accurate measurements of shape and size of side window are taken in order to prepare templates

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Suitable materials and equipment are used to fabricate templates

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Templates are completed according to workplace procedures and without causing damage to vehicle or components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Mark out and cut panel for side window

  1. Template is used to mark out areas on vehicle to be cut
  2. Window opening is cut in panel using approved methods and equipment according to workplace procedures and safety and environmental requirements
  3. Panel edges and trim are prepared for installation of side window
  4. Panels and trim are reinforced as required to comply with vehicle manufacturer specifications and without causing damage to vehicle or components
Template is used to mark out areas on vehicle to be cut

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Window opening is cut in panel using approved methods and equipment according to workplace procedures and safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Panel edges and trim are prepared for installation of side window

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Panels and trim are reinforced as required to comply with vehicle manufacturer specifications and without causing damage to vehicle or components

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install side window

  1. Material to be installed in vehicle side opening is selected and prepared
  2. Side window is installed to manufacturer specifications using either rubber or direct glazing according to safety and environmental requirements
  3. Window in panel opening is secured using approved materials
Material to be installed in vehicle side opening is selected and prepared

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Side window is installed to manufacturer specifications using either rubber or direct glazing according to safety and environmental requirements

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Window in panel opening is secured using approved materials

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete work processes

  1. Final inspection is made to ensure work meets workplace expectations, related accessories are operating correctly, customer is informed of time to wait before driving vehicle, and vehicle is presented ready for use
  2. Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
  3. Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
  4. Workplace documentation is processed according to workplace procedures
Final inspection is made to ensure work meets workplace expectations, related accessories are operating correctly, customer is informed of time to wait before driving vehicle, and vehicle is presented ready for use

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Workplace documentation is processed according to workplace procedures

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install side window

1.1 Job requirements are determined from workplace instructions

1.2 Information is accessed and interpreted from manufacturer specifications, workplace procedures, and sealant safety data sheets (SDS)

1.3 Work is planned to minimise waste and use time efficiently

1.4 Vehicle is inspected to ensure there is no prior damage and that all related accessories are operating correctly

1.5 Materials required to install side window are selected and checked for quality

1.6 Hazards associated with the work are identified and risks are managed

1.7 Tools and equipment for making opening and installing side window are selected and checked for serviceability

1.8 Vehicle is protected and safely located according to workplace procedures

2. Fabricate templates

2.1 Accurate measurements of shape and size of side window are taken in order to prepare templates

2.2 Suitable materials and equipment are used to fabricate templates

2.3 Templates are completed according to workplace procedures and without causing damage to vehicle or components

3. Mark out and cut panel for side window

3.1 Template is used to mark out areas on vehicle to be cut

3.2 Window opening is cut in panel using approved methods and equipment according to workplace procedures and safety and environmental requirements

3.3 Panel edges and trim are prepared for installation of side window

3.4 Panels and trim are reinforced as required to comply with vehicle manufacturer specifications and without causing damage to vehicle or components

4. Install side window

4.1 Material to be installed in vehicle side opening is selected and prepared

4.2 Side window is installed to manufacturer specifications using either rubber or direct glazing according to safety and environmental requirements

4.3 Window in panel opening is secured using approved materials

5. Complete work processes

5.1 Final inspection is made to ensure work meets workplace expectations, related accessories are operating correctly, customer is informed of time to wait before driving vehicle, and vehicle is presented ready for use

5.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

5.3 Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

5.4 Workplace documentation is processed according to workplace procedures

Required Skills and Knowledge

Elements

Elements describe the essential outcomes.

Performance Criteria

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.

1. Prepare to install side window

1.1 Job requirements are determined from workplace instructions

1.2 Information is accessed and interpreted from manufacturer specifications, workplace procedures, and sealant safety data sheets (SDS)

1.3 Work is planned to minimise waste and use time efficiently

1.4 Vehicle is inspected to ensure there is no prior damage and that all related accessories are operating correctly

1.5 Materials required to install side window are selected and checked for quality

1.6 Hazards associated with the work are identified and risks are managed

1.7 Tools and equipment for making opening and installing side window are selected and checked for serviceability

1.8 Vehicle is protected and safely located according to workplace procedures

2. Fabricate templates

2.1 Accurate measurements of shape and size of side window are taken in order to prepare templates

2.2 Suitable materials and equipment are used to fabricate templates

2.3 Templates are completed according to workplace procedures and without causing damage to vehicle or components

3. Mark out and cut panel for side window

3.1 Template is used to mark out areas on vehicle to be cut

3.2 Window opening is cut in panel using approved methods and equipment according to workplace procedures and safety and environmental requirements

3.3 Panel edges and trim are prepared for installation of side window

3.4 Panels and trim are reinforced as required to comply with vehicle manufacturer specifications and without causing damage to vehicle or components

4. Install side window

4.1 Material to be installed in vehicle side opening is selected and prepared

4.2 Side window is installed to manufacturer specifications using either rubber or direct glazing according to safety and environmental requirements

4.3 Window in panel opening is secured using approved materials

5. Complete work processes

5.1 Final inspection is made to ensure work meets workplace expectations, related accessories are operating correctly, customer is informed of time to wait before driving vehicle, and vehicle is presented ready for use

5.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored

5.3 Tools and equipment are checked, reported if faulty, and stored according to workplace procedures

5.4 Workplace documentation is processed according to workplace procedures

Before competency can be determined, individuals must demonstrate they can perform the following according to the standard defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

install side windows in two different vehicles.

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to installing side vehicle windows, including procedures for:

selecting and using personal protective equipment (PPE)

using tools and lifting equipment

using safety data sheets (SDS) for sealants

material handling and storage

environmental requirements, including procedures for trapping, storing and disposing of waste materials and chemicals

location and content of side window manufacturer technical information and specifications

side window installation methods and techniques, including:

template production

template materials

measuring and marking out procedures

procedures for cutting windows and panels

side window installation procedures

type and use of specialist tools and equipment

glass and material handling techniques

type of adhesives and sealants and their application

potential problems and consequences

cleaning materials and techniques

procedures for protecting vehicle and components when installing side vehicle windows

procedures for final inspection of fitted side windows.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Materials must include:

side window

panel material

template materials

trim

sealants and adhesives

cleaning agents.

Tools and equipment mustinclude:

personal protective equipment (PPE)

hand and power tools

measuring equipment

metal cutting equipment

vehicle protection equipment

templates.

Safety and environmental requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

selecting and using PPE

using tools and lifting equipment

using SDS for sealants

material handling and storage

environmental requirements, including procedures for trapping, storing and disposing of waste materials and chemicals.