The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work
|
|
OH&S requirements recognised and adhered to in accordance with application tasks and workplace environment. Completed |
Evidence:
|
Requirements of job identified from drawings or instructions. Completed |
Evidence:
|
Appropriate personal protective equipment selected, correctly fitted and used. Completed |
Evidence:
|
Tools and equipment selected consistent with job requirements, checked for serviceability and any faults reported to supervisor. Completed |
Evidence:
|
Quality Assurance requirements recognised and adhered to in accordance with company's construction operations. Completed |
Evidence:
|
Set up and use levelling device
|
|
Heights to be transferred, identified from given instructions or drawings. Completed |
Evidence:
|
Work assembled and filled with water to required level with air bubbles removed. Completed |
Evidence:
|
Height transferred to required locations to a tolerance of + or - 5mm over 3 metres. Completed |
Evidence:
|
Transfer heights with straight edge and spirit level
|
|
Heights to be transferred identified from given instructions/drawings/given marked level. Completed |
Evidence:
|
Height transferred to required location to + or - 5mm over 3 metres. Completed |
Evidence:
|
Maintain given level or specified slope with boning rods
|
|
Heights of each end of line to be boned established to given levels. Completed |
Evidence:
|
End of boning rods securely fixed to required heights. Completed |
Evidence:
|
Heights of intermediate points sighted and marked with boning rods to a tolerance of + 10mm. Completed |
Evidence:
|
Clean up
|
|
Tools and equipment cleaned, maintained and stored. Completed |
Evidence:
|