Evidence Guide: CPCCBC4010B - Apply structural principles to residential low rise constructions

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCBC4010B - Apply structural principles to residential low rise constructions

What evidence can you provide to prove your understanding of each of the following citeria?

Apply structural principles when planning the erection or demolition of a structure.

  1. Main structural principles that apply to the erection or demolition of a residential low rise structure are identified.
  2. Structural performance of a structure is described in terms of the effect of section properties on various materials.
  3. Structural performance characteristics of slabs, floors, beams, columns and retaining walls are explained and applied to the planning of the construction work.
  4. Demolition of existing structures is coordinated in accordance with legislative and planning requirements, environmental standards, and safe work practices.
Main structural principles that apply to the erection or demolition of a residential low rise structure are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structural performance of a structure is described in terms of the effect of section properties on various materials.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structural performance characteristics of slabs, floors, beams, columns and retaining walls are explained and applied to the planning of the construction work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Demolition of existing structures is coordinated in accordance with legislative and planning requirements, environmental standards, and safe work practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Analyse and plan for the structural integrity of Class1 and Class 10 buildings.

  1. Relevant industry professionals are consulted as required to provide advice regarding the design process and the structural integrity of the proposed Class 1 or Class 10 building.
  2. Project documentation is collected and analysed to assist in the analysis of plans and specifications.
  3. Project documentation is analysed for compliance with BCA requirements for bushfire, high wind, earthquake and alpine environments.
  4. New and emerging building technologies are assessed for application to the construction process and their compliance with BCA requirements and Australian standards.
  5. Pre-commencement site inspection is conducted to confirm analysis.
Relevant industry professionals are consulted as required to provide advice regarding the design process and the structural integrity of the proposed Class 1 or Class 10 building.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project documentation is collected and analysed to assist in the analysis of plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Project documentation is analysed for compliance with BCA requirements for bushfire, high wind, earthquake and alpine environments.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

New and emerging building technologies are assessed for application to the construction process and their compliance with BCA requirements and Australian standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Pre-commencement site inspection is conducted to confirm analysis.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan, coordinate and manage the laying of footings.

  1. Footings are set out in accordance with building's plan.
  2. Structural integrity of the footings specified in building's plan is assessed for compliance with relevant codes and accepted industry construction principles.
  3. Footings specified in building's plan are laid and checked for compliance with project documentation.
  4. Damp coursing, provision of termite barriers, and other relevant techniques are planned, implemented and checked in accordance with codes, standards and industry practice.
Footings are set out in accordance with building's plan.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structural integrity of the footings specified in building's plan is assessed for compliance with relevant codes and accepted industry construction principles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Footings specified in building's plan are laid and checked for compliance with project documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Damp coursing, provision of termite barriers, and other relevant techniques are planned, implemented and checked in accordance with codes, standards and industry practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan, coordinate and manage the laying of floor system.

  1. Concrete slab or bearers and joists specified in building's plan are assessed for structural integrity and compliance with relevant codes and accepted industry construction principles.
  2. Laying of floor system specified in building's plan is supervised and checked for compliance with project documentation.
Concrete slab or bearers and joists specified in building's plan are assessed for structural integrity and compliance with relevant codes and accepted industry construction principles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Laying of floor system specified in building's plan is supervised and checked for compliance with project documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan, coordinate and manage the building of structural and non-structural wall systems.

  1. Technical construction principles and performance of materials used in the construction are identified and analysed in the planning of the building and construction project.
  2. Application of bracing requirements, tie-downs, tolerances, allowances, and fixing and installation of components are planned, implemented and checked for compliance with relevant Australian standards, codes and manufacturer specifications.
  3. Structural timber members are selected for low rise buildings to conform to AS1684 requirements.
  4. Processes are put in place and managed to ensure quality of the frame, whether factory pre-cut and pre-nailed, factory pre-cut and assembled on site, or cut and assembled on site.
  5. Vapour permeable sarking or a waterproof membrane, relevant to construction method, is attached and checked.
Technical construction principles and performance of materials used in the construction are identified and analysed in the planning of the building and construction project.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Application of bracing requirements, tie-downs, tolerances, allowances, and fixing and installation of components are planned, implemented and checked for compliance with relevant Australian standards, codes and manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Structural timber members are selected for low rise buildings to conform to AS1684 requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Processes are put in place and managed to ensure quality of the frame, whether factory pre-cut and pre-nailed, factory pre-cut and assembled on site, or cut and assembled on site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Vapour permeable sarking or a waterproof membrane, relevant to construction method, is attached and checked.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan, coordinate and manage the building of roof system.

  1. Structural integrity of roof system components specified in building's plan is assessed for compliance with relevant codes and accepted industry construction principles.
  2. Erection of roof trusses is planned, implemented and checked in accordance with requirements of building plan, type of roof being constructed, relevant codes and accepted industry construction principles.
  3. Processes are put in place and managed to ensure quality of the manufactured roof trusses or hand-cut roof system.
  4. Roof sarking and cladding are planned and installation is supervised and checked for compliance with codes, standards and industry practice.
Structural integrity of roof system components specified in building's plan is assessed for compliance with relevant codes and accepted industry construction principles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erection of roof trusses is planned, implemented and checked in accordance with requirements of building plan, type of roof being constructed, relevant codes and accepted industry construction principles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Processes are put in place and managed to ensure quality of the manufactured roof trusses or hand-cut roof system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Roof sarking and cladding are planned and installation is supervised and checked for compliance with codes, standards and industry practice.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan, coordinate and manage the external wall cladding of structure.

  1. Structural performance of cladding to be used for bracing in the frame construction is assessed for compliance with relevant codes, manufacturer specifications and accepted industry construction principles.
  2. Installation of the cladding, as specified in building's plan, is supervised and checked for compliance with standards and accepted industry construction principles.
  3. Installation of windows and external doors is supervised to ensure compliance with relevant codes, manufacturer specifications and accepted industry construction principles.
Structural performance of cladding to be used for bracing in the frame construction is assessed for compliance with relevant codes, manufacturer specifications and accepted industry construction principles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation of the cladding, as specified in building's plan, is supervised and checked for compliance with standards and accepted industry construction principles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Installation of windows and external doors is supervised to ensure compliance with relevant codes, manufacturer specifications and accepted industry construction principles.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed by the effective application of structural principles and concepts in accordance with the range of variables and application to only one sector of the building and construction industry.

This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

assess the structural integrity of a variety of structures found on building and construction sites

apply the structural principles behind the safe erection and demolition of a low rise structure classified within the BCA as Class 1 and 10

apply technical construction principles to the appropriate selection, integration and building in of construction elements and components

coordinate, plan, implement and check the building of a low rise structure.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

documentation that should normally be available in either a building or construction office

relevant codes, standards and government regulations

office equipment, including calculators, photocopiers and telephone systems

computers with appropriate software to view 2-D CAD drawings, run costing programs and print copies

technical reference library with current publications on measurement, design, building construction and manufacturers' product literature

suitable work area appropriate to the construction process.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

apply manufacturer specifications and Australian standards and codes

apply structural principles to a variety of structures within BCA Classes 1 and 10

communication skills to:

consult with industry professionals

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

read and interpret project documentation

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication

identify and analyse relevant information

select structural members based on project or specification requirements

work safely to OHS regulations and site requirements.

Required knowledge

Required knowledge for this unit is:

building and construction industry contracts

relevant state or territory building and construction codes, standards and government regulations

underlying mathematics related to structural analysis

workplace safety requirements.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Structural principles include:

behaviour of structural materials

loads and loading

performance of beams

performance of columns

performance of roof trusses

section properties

solution of force systems

wind bracing.

Residential low rise buildings as described within the BCA are:

Class 1

Class 10.

Industry professionals include:

architects

draftspersons

engineers

quantity surveyors

surveyors.

Project documentation includes:

building approval plans

contract plans

designs and specifications

engineer footing designs and specifications

original contour survey plan

registered plans

retaining walls

site plans

soil investigation reports

structural floor systems, wall systems and roof systems

tanking designs and specifications

underpinning, rock anchors and shoring designs and specifications.

Footings include:

bored pier footings

columns or stumps

concrete slab floors

piers and beams.

Floor system components of the bearers and joists include:

compressed sheet wet area flooring

engineered floor joists

fitted (cut-in) floors

platform floor construction

sheet flooring

tongue and groove flooring.

Materials include:

cavity brick

concrete block

structural steel

timber.

Type of roof includes:

box gable

dual pitch roof

Dutch gable

Dutch hip

gable end

hip and valley

north light

skillion.

Cladding used on timber frame constructions includes:

brick veneer

coatings over base materials

colourbond or zincalume sheeting

fibre cement or compressed wood panelling

weatherboards.