The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Set out and prepare the base location of work.
|
|
Location of the brickwork is set out to position in accordance with job specifications and drawings. Completed |
Evidence:
|
Base location is prepared so that the surface is dry, horizontal, clean and flat, and in accordance with job specifications. Completed |
Evidence:
|
Lay brickwork.
|
|
Fire clay is applied to bricks to maintain joints at the specified thickness. Completed |
Evidence:
|
Bricks are in the required bond and set out, method and line, level and plumb in accordance with job specifications and drawings. Completed |
Evidence:
|
Bricks are cut to the correct length to maintain the required bond in accordance with manufacturer recommendations and job specifications. Completed |
Evidence:
|
Brickwork is completed with surplus fire clay removed to specification requirements. Completed |
Evidence:
|
Form a segmental arch.
|
|
Span and rise of the arch are identified and located in accordance with job plans and specifications. Completed |
Evidence:
|
Adjustable props are placed appropriately to support the timber arch centre, and adjusted as necessary. Completed |
Evidence:
|
Position of the central key brick is established and marked for easy identification. Completed |
Evidence:
|
Cut and lay bricks to position around the arch.
|
|
Bricks are cut and laid on the centre to form an arch to specifications. Completed |
Evidence:
|
Same sized wedge shape brick is maintained throughout the construction of the arch. Completed |
Evidence:
|
Measurements and placement of bricks are monitored and adjusted accordingly to ensure accurate application of job requirements. Completed |
Evidence:
|
Complete and review finished work.
|
|
Props and other support materials are removed. Completed |
Evidence:
|
Construction is finished and cleaned to meet job requirements and professional expectations. Completed |
Evidence:
|
Intrados of the arch is cleaned and repointed with mortar as necessary. Completed |
Evidence:
|