The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out bricklaying and blocklaying tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans and specifications. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Manually handle bricklaying and blocklaying materials.
|
|
Bricklaying and blocklaying materials and components are identified and checked for conformity to material schedule, plans and specifications. Completed |
Evidence:
|
Handling characteristics of bricklaying and blocklaying materials and components are identified and safe and effective handling techniques, including mechanical handling, are applied. Completed |
Evidence:
|
Bricklaying and blocklaying materials and components are sorted and stacked for support of the job in accordance with supervisor's instructions and/or specifications. Completed |
Evidence:
|
Bricklaying and blocklaying materials and components are protected against physical damage and stored clear of traffic ways. Completed |
Evidence:
|
Perform mechanical handling of materials.
|
|
Bricklaying and blocklaying materials and components are prepared and positioned for mechanical handling in accordance with type of material and plant or equipment to be used. Completed |
Evidence:
|
Materials and components are loaded, unloaded, moved, located and/or installed in accordance with workplace procedures. Completed |
Evidence:
|
Bricklaying and blocklaying materials and components are safely handled with assistance of mechanical lifting devices in accordance with workplace requirements. Completed |
Evidence:
|
Mix bricklaying and blocklaying mortar.
|
|
Mortar ingredients are identified and positioned in the vicinity of the mixing area. Completed |
Evidence:
|
Mixing equipment is prepared and operated in accordance with manufacturers' instructions and workplace procedures. Completed |
Evidence:
|
Mortar is mixed to specifications in accordance with workplace procedures. Completed |
Evidence:
|
Handle and remove waste materials.
|
|
Waste bricklaying and blocklaying materials and components are handled in accordance with material safety data sheet (MSDS) and regulatory requirements. Completed |
Evidence:
|
Hazardous material is identified for separate handling. Completed |
Evidence:
|
Non-toxic materials are removed using appropriate procedures. Completed |
Evidence:
|
Dust suppression procedures are used to minimise health risk to work personnel and others. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and waste materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|