Evidence Guide: CPCCBS6009 - Process building applications for commercial buildings up to three storeys

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCBS6009 - Process building applications for commercial buildings up to three storeys

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to assess building application.

  1. Nature and scope of building application are reviewed and relevant legislation, codes and local planning policies are accessed.
  2. Specific building approval timelines and administrative requirements of the relevant local authority are identified and clarified.
  3. Proposed development site is inspected where necessary, to assist in understanding the nature of the development and potential impact on surrounding environment and structures.
  4. Need for advice from external consultants with specialist expertise is identified and relevant consultants are liaised with to provide advice throughout the building application process.
  5. Aspects of the application requiring consents or approvals from service authorities are identified and initiated.
Nature and scope of building application are reviewed and relevant legislation, codes and local planning policies are accessed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Specific building approval timelines and administrative requirements of the relevant local authority are identified and clarified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Proposed development site is inspected where necessary, to assist in understanding the nature of the development and potential impact on surrounding environment and structures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Need for advice from external consultants with specialist expertise is identified and relevant consultants are liaised with to provide advice throughout the building application process.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Aspects of the application requiring consents or approvals from service authorities are identified and initiated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess building application documentation.

  1. Documentation received in support of building application is reviewed for accuracy, currency and completeness according to local authority requirements, and further information is requested from client where necessary.
  2. Property ownership is confirmed with reference to titles and other relevant documentation.
  3. Documentation submitted is assessed for compliance with current and relevant local planning scheme, codes and legislation, and areas of non-compliance are documented for discussion with client.
  4. Site of proposed building application is reviewed for possible environmental protection laws and exclusions, and compliance requirements are noted and documented for discussion with client.
  5. Design plans are assessed for compliance with relevant legislation, codes and regulations, and areas of non-compliance are documented for discussion with client, architect or building designer.
  6. Required amendments to plans to ensure compliance and proposed alternative solutions are documented and communicated to client.
Documentation received in support of building application is reviewed for accuracy, currency and completeness according to local authority requirements, and further information is requested from client where necessary.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Property ownership is confirmed with reference to titles and other relevant documentation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Documentation submitted is assessed for compliance with current and relevant local planning scheme, codes and legislation, and areas of non-compliance are documented for discussion with client.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site of proposed building application is reviewed for possible environmental protection laws and exclusions, and compliance requirements are noted and documented for discussion with client.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design plans are assessed for compliance with relevant legislation, codes and regulations, and areas of non-compliance are documented for discussion with client, architect or building designer.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Required amendments to plans to ensure compliance and proposed alternative solutions are documented and communicated to client.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess revised design plans.

  1. Revised plans and documentation re-submitted for building approval are assessed for compliance.
  2. Design features requiring clarification are discussed with client, architect or building designer as necessary to ensure plans meet compliance requirements.
  3. Client is updated on progress of the building application process as necessary.
Revised plans and documentation re-submitted for building approval are assessed for compliance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Design features requiring clarification are discussed with client, architect or building designer as necessary to ensure plans meet compliance requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Client is updated on progress of the building application process as necessary.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finalise building permission.

  1. Public notices are arranged according to local authority requirements, and objections are documented and handled according to regulations and workplace procedures.
  2. Final building permit is processed, including relevant permission conditions that ensure protection of the environment, adjacent structures and where appropriate, heritage listed structures.
  3. Copy of building permit is submitted to local authority and client as required.
Public notices are arranged according to local authority requirements, and objections are documented and handled according to regulations and workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Final building permit is processed, including relevant permission conditions that ensure protection of the environment, adjacent structures and where appropriate, heritage listed structures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Copy of building permit is submitted to local authority and client as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and prepare to assess building application.

1.1.

Nature and scope of building application are reviewed and relevant legislation, codes and local planning policies are accessed.

1.2.

Specific building approval timelines and administrative requirements of the relevant local authority are identified and clarified.

1.3.

Proposed development site is inspected where necessary, to assist in understanding the nature of the development and potential impact on surrounding environment and structures.

1.4.

Need for advice from external consultants with specialist expertise is identified and relevant consultants are liaised with to provide advice throughout the building application process.

1.5.

Aspects of the application requiring consents or approvals from service authorities are identified and initiated.

2.

Assess building application documentation.

2.1.

Documentation received in support of building application is reviewed for accuracy, currency and completeness according to local authority requirements, and further information is requested from client where necessary.

2.2.

Property ownership is confirmed with reference to titles and other relevant documentation.

2.3.

Documentation submitted is assessed for compliance with current and relevant local planning scheme, codes and legislation, and areas of non-compliance are documented for discussion with client.

2.4.

Site of proposed building application is reviewed for possible environmental protection laws and exclusions, and compliance requirements are noted and documented for discussion with client.

2.5.

Design plans are assessed for compliance with relevant legislation, codes and regulations, and areas of non-compliance are documented for discussion with client, architect or building designer.

2.6.

Required amendments to plans to ensure compliance and proposed alternative solutions are documented and communicated to client.

3.

Assess revised design plans.

3.1.

Revised plans and documentation re-submitted for building approval are assessed for compliance.

3.2.

Design features requiring clarification are discussed with client, architect or building designer as necessary to ensure plans meet compliance requirements.

3.3.

Client is updated on progress of the building application process as necessary.

4.

Finalise building permission.

4.1.

Public notices are arranged according to local authority requirements, and objections are documented and handled according to regulations and workplace procedures.

4.2.

Final building permit is processed, including relevant permission conditions that ensure protection of the environment, adjacent structures and where appropriate, heritage listed structures.

4.3.

Copy of building permit is submitted to local authority and client as required.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and prepare to assess building application.

1.1.

Nature and scope of building application are reviewed and relevant legislation, codes and local planning policies are accessed.

1.2.

Specific building approval timelines and administrative requirements of the relevant local authority are identified and clarified.

1.3.

Proposed development site is inspected where necessary, to assist in understanding the nature of the development and potential impact on surrounding environment and structures.

1.4.

Need for advice from external consultants with specialist expertise is identified and relevant consultants are liaised with to provide advice throughout the building application process.

1.5.

Aspects of the application requiring consents or approvals from service authorities are identified and initiated.

2.

Assess building application documentation.

2.1.

Documentation received in support of building application is reviewed for accuracy, currency and completeness according to local authority requirements, and further information is requested from client where necessary.

2.2.

Property ownership is confirmed with reference to titles and other relevant documentation.

2.3.

Documentation submitted is assessed for compliance with current and relevant local planning scheme, codes and legislation, and areas of non-compliance are documented for discussion with client.

2.4.

Site of proposed building application is reviewed for possible environmental protection laws and exclusions, and compliance requirements are noted and documented for discussion with client.

2.5.

Design plans are assessed for compliance with relevant legislation, codes and regulations, and areas of non-compliance are documented for discussion with client, architect or building designer.

2.6.

Required amendments to plans to ensure compliance and proposed alternative solutions are documented and communicated to client.

3.

Assess revised design plans.

3.1.

Revised plans and documentation re-submitted for building approval are assessed for compliance.

3.2.

Design features requiring clarification are discussed with client, architect or building designer as necessary to ensure plans meet compliance requirements.

3.3.

Client is updated on progress of the building application process as necessary.

4.

Finalise building permission.

4.1.

Public notices are arranged according to local authority requirements, and objections are documented and handled according to regulations and workplace procedures.

4.2.

Final building permit is processed, including relevant permission conditions that ensure protection of the environment, adjacent structures and where appropriate, heritage listed structures.

4.3.

Copy of building permit is submitted to local authority and client as required.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. The person must process building applications for three different projects involving the following class buildings as defined in the Building Code of Australia (BCA), where:

one project must incorporate classes 2, 5, 6 and 7a

one project must incorporate classes 3 or 9c

one project must incorporate classes 7b and 8.

Each of the above buildings must be no more than three storeys.

In doing the above, the person must:

identify relevant approving authority administrative requirements for assessing and issuing building permissions and ensure adherence to relevant administrative processes

identify all codes, legislation and planning provisions applicable to the proposed building application

gather relevant building application documentation, including drawings, for each building project and assess each application for compliance with relevant legislation, codes, regulations and local building authority requirements

analyse documentation supplied by at least one external consultant for each building application to ensure information is accurate and complete and to determine compliance of the building application

seek and obtain approval or consent from at least one service authority for each building approval application

identify and note areas of non-compliance and produce a range of alternative solutions for client consideration

document final building permission for each building approval, noting specific conditions and validity of each permit

lodge final building approval with the relevant authorities and notify the client.

A person demonstrating competency in this unit must demonstrate knowledge of:

BCA classification and definitions for buildings included in classes 2 to 9

construction methods and materials suitable for buildings in classes 2 to 9

drawing symbols, notations, acronyms and construction terminology used in the National Construction Code (NCC), Australian standards, working drawings, and building design specifications

legislative and local planning and building requirements governing the issuing of building approval permits in the jurisdictions relevant to each building specified in the performance evidence

legislative roles and responsibilities of those issuing building permits in the relevant jurisdiction.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Consultants must include at least one of the following:

access consultants

energy efficiency assessors

fire services engineers

geotechnical engineers

heritage consultants

hydraulic engineers

mechanical engineers

structural engineers

waterproofing specialists.

Service authorities must include:

drainage authority

electricity supply authority

gas supply authority

relevant municipal council

sewerage authority

water supply authority.

Documentation must include:

building approval application form

concept drawings to scale, with relevant calculations, levels, notes and specifications

documentation from specialist consultants

proof of building site ownership.