Evidence Guide: CPCCBS6013 - Conduct and report on initial construction inspections of commercial buildings up to three storeys

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCBS6013 - Conduct and report on initial construction inspections of commercial buildings up to three storeys

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare to inspect site preparation and foundations and footings.

  1. Site classification is determined according to BCA definitions and compliance requirements for site preparation, foundations and footings are identified and interpreted.
  2. Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.
  3. Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.
  4. Missed inspections are recorded and reported according to legislative and regulatory requirements.
  5. Work health and safety (WHS) requirements for inspections of site preparations, foundations and footings are identified.
Site classification is determined according to BCA definitions and compliance requirements for site preparation, foundations and footings are identified and interpreted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Missed inspections are recorded and reported according to legislative and regulatory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work health and safety (WHS) requirements for inspections of site preparations, foundations and footings are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and report on site preparation, foundations and footings.

  1. Site preparation, foundations and footings are surveyed according to project, statutory and WHS requirements.
  2. Features of site preparation, foundations and footings are assessed against compliance requirements, approved drawings, and discussed with on-site personnel as required.
  3. Inspections undertaken to ensure compliance with waterproofing are validated and documented.
  4. Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.
  5. Non-compliant features are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.
  6. Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.
  7. Certificate of compliance for foundations and footings is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.
Site preparation, foundations and footings are surveyed according to project, statutory and WHS requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Features of site preparation, foundations and footings are assessed against compliance requirements, approved drawings, and discussed with on-site personnel as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspections undertaken to ensure compliance with waterproofing are validated and documented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Non-compliant features are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Certificate of compliance for foundations and footings is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to inspect structural provisions.

  1. Extreme weather events for the area are determined and compliance requirements for structural provisions are identified and interpreted.
  2. Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.
  3. Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.
  4. Missed inspections are recorded and reported according to legislative and regulatory requirements.
  5. WHS requirements for inspections of structural provisions are identified.
Extreme weather events for the area are determined and compliance requirements for structural provisions are identified and interpreted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Missed inspections are recorded and reported according to legislative and regulatory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS requirements for inspections of structural provisions are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and report on structural provisions.

  1. Structural provisions are inspected according to project, statutory and WHS requirements.
  2. Features of structural provisions are assessed against compliance requirements and approved drawings, and discussed with on-site personnel as required.
  3. Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.
  4. Non-compliant features of structural provisions are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.
  5. Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.
  6. Certificate of compliance for structural provisions is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.
Structural provisions are inspected according to project, statutory and WHS requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Features of structural provisions are assessed against compliance requirements and approved drawings, and discussed with on-site personnel as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Non-compliant features of structural provisions are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Certificate of compliance for structural provisions is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare to inspect wet areas.

  1. Wall and substrate construction methods and materials are identified.
  2. Compliance requirements for waterproofing are identified and interpreted.
  3. Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.
  4. Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.
  5. Missed inspections are recorded and reported according to legislative and regulatory requirements.
  6. WHS requirements for inspections of wet areas are identified.
Wall and substrate construction methods and materials are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Compliance requirements for waterproofing are identified and interpreted.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Missed inspections are recorded and reported according to legislative and regulatory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

WHS requirements for inspections of wet areas are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Inspect and report on wet areas.

  1. Wet areas are inspected according to project, statutory and WHS requirements.
  2. Waterproofing installation is assessed against manufacturer specifications, compliance requirements and approved drawings and discussed with on-site personnel as required.
  3. Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.
  4. Non-compliant features of wet areas are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.
  5. Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.
  6. Certificate of compliance for wet areas is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.
Wet areas are inspected according to project, statutory and WHS requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waterproofing installation is assessed against manufacturer specifications, compliance requirements and approved drawings and discussed with on-site personnel as required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Non-compliant features of wet areas are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Certificate of compliance for wet areas is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and prepare to inspect site preparation and foundations and footings.

1.1.

Site classification is determined according to BCA definitions and compliance requirements for site preparation, foundations and footings are identified and interpreted.

1.2.

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

1.3.

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

1.4.

Missed inspections are recorded and reported according to legislative and regulatory requirements.

1.5.

Work health and safety (WHS) requirements for inspections of site preparations, foundations and footings are identified.

2.

Inspect and report on site preparation, foundations and footings.

2.1.

Site preparation, foundations and footings are surveyed according to project, statutory and WHS requirements.

2.2.

Features of site preparation, foundations and footings are assessed against compliance requirements, approved drawings, and discussed with on-site personnel as required.

2.3.

Inspections undertaken to ensure compliance with waterproofing are validated and documented.

2.4.

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

2.5.

Non-compliant features are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

2.6.

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

2.7.

Certificate of compliance for foundations and footings is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

3.

Plan and prepare to inspect structural provisions.

3.1.

Extreme weather events for the area are determined and compliance requirements for structural provisions are identified and interpreted.

3.2.

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

3.3.

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

3.4.

Missed inspections are recorded and reported according to legislative and regulatory requirements.

3.5.

WHS requirements for inspections of structural provisions are identified.

4.

Inspect and report on structural provisions.

4.1.

Structural provisions are inspected according to project, statutory and WHS requirements.

4.2.

Features of structural provisions are assessed against compliance requirements and approved drawings, and discussed with on-site personnel as required.

4.3.

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

4.4.

Non-compliant features of structural provisions are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

4.5.

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

4.6.

Certificate of compliance for structural provisions is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

5.

Plan and prepare to inspect wet areas.

5.1.

Wall and substrate construction methods and materials are identified.

5.2.

Compliance requirements for waterproofing are identified and interpreted.

5.3.

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

5.4.

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

5.5.

Missed inspections are recorded and reported according to legislative and regulatory requirements.

5.6.

WHS requirements for inspections of wet areas are identified.

6.

Inspect and report on wet areas.

6.1.

Wet areas are inspected according to project, statutory and WHS requirements.

6.2.

Waterproofing installation is assessed against manufacturer specifications, compliance requirements and approved drawings and discussed with on-site personnel as required.

6.3.

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

6.4.

Non-compliant features of wet areas are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

6.5.

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

6.6.

Certificate of compliance for wet areas is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan and prepare to inspect site preparation and foundations and footings.

1.1.

Site classification is determined according to BCA definitions and compliance requirements for site preparation, foundations and footings are identified and interpreted.

1.2.

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

1.3.

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

1.4.

Missed inspections are recorded and reported according to legislative and regulatory requirements.

1.5.

Work health and safety (WHS) requirements for inspections of site preparations, foundations and footings are identified.

2.

Inspect and report on site preparation, foundations and footings.

2.1.

Site preparation, foundations and footings are surveyed according to project, statutory and WHS requirements.

2.2.

Features of site preparation, foundations and footings are assessed against compliance requirements, approved drawings, and discussed with on-site personnel as required.

2.3.

Inspections undertaken to ensure compliance with waterproofing are validated and documented.

2.4.

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

2.5.

Non-compliant features are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

2.6.

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

2.7.

Certificate of compliance for foundations and footings is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

3.

Plan and prepare to inspect structural provisions.

3.1.

Extreme weather events for the area are determined and compliance requirements for structural provisions are identified and interpreted.

3.2.

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

3.3.

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

3.4.

Missed inspections are recorded and reported according to legislative and regulatory requirements.

3.5.

WHS requirements for inspections of structural provisions are identified.

4.

Inspect and report on structural provisions.

4.1.

Structural provisions are inspected according to project, statutory and WHS requirements.

4.2.

Features of structural provisions are assessed against compliance requirements and approved drawings, and discussed with on-site personnel as required.

4.3.

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

4.4.

Non-compliant features of structural provisions are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

4.5.

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

4.6.

Certificate of compliance for structural provisions is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

5.

Plan and prepare to inspect wet areas.

5.1.

Wall and substrate construction methods and materials are identified.

5.2.

Compliance requirements for waterproofing are identified and interpreted.

5.3.

Approved building design drawings and specifications are interpreted and variations from deemed-to-satisfy provisions for compliance are confirmed with senior personnel or statutory authority.

5.4.

Inspection is scheduled according to project and legislative and regulatory requirements, and stakeholders are notified as required.

5.5.

Missed inspections are recorded and reported according to legislative and regulatory requirements.

5.6.

WHS requirements for inspections of wet areas are identified.

6.

Inspect and report on wet areas.

6.1.

Wet areas are inspected according to project, statutory and WHS requirements.

6.2.

Waterproofing installation is assessed against manufacturer specifications, compliance requirements and approved drawings and discussed with on-site personnel as required.

6.3.

Details of non-compliant features are documented and reported according to workplace procedures and legislative and regulatory requirements.

6.4.

Non-compliant features of wet areas are discussed with relevant contractors and work required to remedy non-compliance is negotiated according to scope of personal responsibilities.

6.5.

Timeframe for remedial action and rescheduled inspection is negotiated according to scope of personal responsibilities, and contractor’s failure to comply is reported according to legislative and regulatory requirements if required.

6.6.

Certificate of compliance for wet areas is prepared and processed according to legislative and regulatory requirements and scope of personal responsibilities.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit. The person must prepare for, conduct and complete relevant documentation for inspections of 1) site preparation, foundations and footings, 2) structural provisions, and 3) wet areas for the following class buildings as defined in the Building Code of Australia (BCA):

one project incorporating classes 2, 5, 6 and 7a

one project incorporating classes 3 or 9c

one project incorporating classes 7b and 8.

In doing the above, the person must:

interpret working drawings, specifications and building permit conditions for each inspection

identify and interpret relevant compliance requirements

inspect site preparation, foundations and footings and structural provisions for the projects outlined above

observe and document all non-compliant features of site preparation, foundations and footings, structural provisions and wet areas

discuss non-compliance with relevant contractors and negotiate remedial work required

reschedule inspections as required

prepare and process required documentation, including:

details of non-compliance and remedial work recommended

contractor’s failure to comply with recommended remedial work, if required

missed inspection, if required

certificate of compliance, as authorised.

A person demonstrating competency in this unit must demonstrate knowledge of:

BCA classification and definitions for buildings included in classes 2 to 9

construction methods and materials suitable for buildings included in classes 2 to 9 at the following stages:

site preparation

foundations and footings

structural provisions

wet areas

drawing symbols, notations, acronyms and construction terminology used in the National Construction Code (NCC), Australian standards, working drawings, building design specifications, and building permit documentation

principles and purpose of report in the context of conducting and reporting on initial construction inspections

range of, and variations in, compliance requirements for buildings included in classes 2 to 9 in different climatic, geographic and planning zones, including:

building control legislation and regulations

NCC

Australian standards referenced by building control legislation and regulations and the NCC

state, territory or local authority development policies

legislative and regulatory requirements for critical stage inspections relating to buildings included in classes 2 to 9 at the following stages of construction:

bounding construction of class 2 and 3 buildings

site preparation

foundations and footings

structural provisions.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Site classification must include:

advice from relevant authority or experts

determination of soil type, including arrangements for soil testing as required

identification of soil properties and characteristics and effects on site stability, including potential for:

collapsing soil

ground movement due to moisture change

land slips

mine subsidence

soil erosion.

Compliance requirements for site preparation, foundations and footings must include:

AS/NZS1170 Structural design actions

BCA:

deemed-to-satisfy specifications

performance requirements for alternative solutions

building control legislation and regulations

requirements relating to:

excavations

filling under concrete slabs

pest risk management

requirements specified by relevant authority or experts.

Compliance requirements for structural provisions must include:

BCA:

deemed-to-satisfy specifications

performance requirements for alternative solutions

building control legislation and regulations

requirements for:

aluminium

composite steel and concrete

concrete, including tilt-up panel construction

glazed assemblies

masonry

roofs

steel

timber.

Compliance requirements for waterproofing must include:

AS3740 Waterproofing of wet areas within residential buildings, as referenced in the BCA for wet areas of commercial buildings

BCA:

deemed-to-satisfy specifications

performance requirements for alternative solutions

building control legislation and regulations

requirements specified by relevant authority or experts.