The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Manually handle, sort and stack carpentry materials and components.
|
|
Carpentry materials for handling are moved to specified location, applying safe manual handling techniques. Completed |
Evidence:
|
Carpentry materials and components are sorted to suit material type and size, stacked for ease of identification and retrieval and for task sequence and job location in accordance with job specifications. Completed |
Evidence:
|
Carpentry materials and components are protected against physical and water damage and stored clear of access ways, and for ease of identification, retrieval and distribution. Completed |
Evidence:
|
Prepare for mechanical handling of materials.
|
|
Carpentry materials and components are stacked/banded for mechanical handling in accordance with the type of material and plant or equipment to be used. Completed |
Evidence:
|
Carpentry materials and components are loaded, unloaded, moved or located at specified location. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Hazardous materials are identified for separate handling. Completed |
Evidence:
|
Non-toxic materials are removed using correct procedures. Completed |
Evidence:
|
Dust suppression procedures are used to minimise health risk to work personnel and others. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|