NTISthis.com

Evidence Guide: CPCCCA3001A - Carry out general demolition of minor building structures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCCA3001A - Carry out general demolition of minor building structures

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare.

  1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation.
  2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  3. Signage and barricade requirements are identified and implemented.
  4. Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
  5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety (OHS) requirements are followed in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signage and barricade requirements are identified and implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Demolish minor building structures.

  1. Designated demolition area of minor building structure is assessed to determine scope of work in accordance with legislation, regulations and codes of practice and type of construction system.
  2. Risks are identified and managed, including determining the status of existing services.
  3. Preparatory work is completed.
  4. Demolition procedures are carried out consistent with safe and effective processes of dismantling or demolishing and removing materials from location to designated storage area.
  5. Materials and building component parts are safely and effectively handled using appropriate material handling techniques consistent with the type of building materials and components.
  6. Materials and components identified for salvaging are safely and effectively handled, stored and stacked ready for transport in accordance with OHS material handling practices and techniques.
Designated demolition area of minor building structure is assessed to determine scope of work in accordance with legislation, regulations and codes of practice and type of construction system.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Risks are identified and managed, including determining the status of existing services.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Preparatory work is completed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Demolition procedures are carried out consistent with safe and effective processes of dismantling or demolishing and removing materials from location to designated storage area.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials and building component parts are safely and effectively handled using appropriate material handling techniques consistent with the type of building materials and components.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials and components identified for salvaging are safely and effectively handled, stored and stacked ready for transport in accordance with OHS material handling practices and techniques.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up.

  1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools, plant and equipment

communicate and work effectively and safely with others

produce the plan for and complete the demolition of a section of a standard house to accommodate an extension, including removal of an external load bearing wall to form an opening of no less than 3 metres wide.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

plans, specifications and drawings

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

numeracy skills to apply measurements and make calculations

organisational skills, including the ability to plan and set out work

planning and organisational skills to ensure coordinated development of sketches and drawings

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

construction terminology

demolition and building materials

demolition operations and techniques

framing and roofing

hazardous substances, including lead, fibreglass and asbestos

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS)

materials storage and environmentally friendly waste management

plans, specifications and drawings

plant, tools and equipment types, characteristics, uses and limitation

processes for the calculation of material removal

safe use of scaffolding

workplace and equipment safety requirements.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions where specified

memos

MSDS

organisation work specifications and requirements

plans and specifications

regulatory and legislative requirements pertaining to carrying out general demolition of minor building structures

relevant Australian standards

safe work procedures related to carrying out general demolition of minor building structures

signage

verbal or written and graphical instructions

work bulletins

work schedules.

Planning and preparation include:

work site inspection

equipment defect identification

assessment of conditions and hazards

determination of work requirements.

Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:

emergency procedures, including emergency shutdown and stopping, extinguishing fires, organisational first aid requirements and evacuation

handling of materials

hazard control

hazardous materials and substances

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

traffic control

work site visitors and the public

working at heights

working in proximity to others

organisational first aid

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

use of firefighting equipment

use of tools and equipment

workplace environment and safety.

Tools and equipment include:

air compressors

allen keys

angle grinders

brooms

chisels

crow bars

elevated work platforms

hack saws

hammers

hand saws

ladders

picks

pincers

pinch bars

pliers

pneumatic and electric tools

power leads

power saws

props

saw stools and planks

scaffolding

shovels

sledge hammers

spanners

water hoses and spray attachments

wheelbarrows.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications, where specified

workplace operations and procedures.

Materials include:

bonded asbestos

brickwork

concrete

glass

metal

reconstituted timber products

tiles

timber.

Environmental requirements include:

clean-up protection

noise and dust

vibration

waste management.

Statutory and regulatory authorities include:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Minor building structure includes:

detached carports

external sections of buildings (walls, cladding, attached carports, decks and roofs)

internal sections of buildings (walling, lining, built in components and wet area)

pergolas and patios

retaining walls and fences

small concrete structures (slabs, pads, paths and edge strips)

small ground level buildings.

Type of construction system includes:

blockwork

brickwork

concrete

metal framing

timber framing.

Risks include those relating to:

areas below floors

identification, relocation or disconnection of services

loads supported by walls

security and public health and safety

weatherproofing of the structure.

Existing services include:

electricity

gas

telephone and other communications

water.

Preparatory work includes:

acquisition and application of equipment, such as props

avoidance of built-up demolished material

engineering requirements

fall protection

hazardous materials removed separately

isolation of site

permits

removal of combustible material

safe work method statement

specialist trades

spraying water

traffic control

use of dust suppression blanket.

Salvaging includes:

reusing, recycling or selling removed materials.