The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out flooring system tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental policies and procedures and statutory and regulatory authorities requirements. Completed |
Evidence:
|
Set out sub-floor frame.
|
|
Support structure, posts, stumps and piers are positioned and installed to set out lines for building as determined from site drawings in accordance with specifications for floor framing. Completed |
Evidence:
|
Check support structure, posts, stumps and piers for level and square prior to installation of bearers and joists. Completed |
Evidence:
|
Install timber bearers.
|
|
Bearer material is marked and cut to lengths for joining over supports. Completed |
Evidence:
|
Damp proof course and termite shield are installed where specified by regulation. Completed |
Evidence:
|
Bearers are located and fixed in accordance with regulations, job drawings and specifications to square, line and level. Completed |
Evidence:
|
Install timber floor joists.
|
|
Location for floor joists are set out to spacings from job drawings, specifications and regulations. Completed |
Evidence:
|
Material lengths for floor joists are selected. Completed |
Evidence:
|
Floor joists are selected for straightness, located, fitted and fixed to line and level. Completed |
Evidence:
|
Block or herringbone strutting is installed to deep floor joists where specified in accordance with regulations. Completed |
Evidence:
|
Blocks and trimmers are fitted and fixed around doorways and openings to provide support in accordance with specifications. Completed |
Evidence:
|
Trimmers are cut, fitted and fixed to support sheet flooring joints where specified. Completed |
Evidence:
|
Install flooring.
|
|
Flooring materials selected are appropriate for the intended room use and specifications. Completed |
Evidence:
|
Floor measurements are confirmed and flooring materials are cut and prepared for installation with a minimum of loss. Completed |
Evidence:
|
Flooring is installed and secured in accordance with manufacturer recommendations. Completed |
Evidence:
|
Installed flooring is completed in preparation for the next process. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|