The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified and applied for the project in accordance with environmental plans and statutory and regulatory authority obligations. Completed |
Evidence:
|
Construct wall frames.
|
|
Wall frame components are identified and selected in accordance with regulatory criteria and load bearing requirements. Completed |
Evidence:
|
Location of walls is set out on a slab or sub floor frame in accordance with dimensions, drawings, plans and specifications. Completed |
Evidence:
|
Wall plates are set out and cut to length. Completed |
Evidence:
|
Wall plates are marked to accommodate studs and openings and/or cladding and lining types. Completed |
Evidence:
|
Pattern stud is set out. Completed |
Evidence:
|
Studs, trimmers and noggings are cut to length. Completed |
Evidence:
|
Wall frames are fabricated, including lintels and bracing. Completed |
Evidence:
|
Wall frames are erected, fixed into place and aligned to specification. Completed |
Evidence:
|
Erected walls are temporarily braced. Completed |
Evidence:
|
Walls are straightened, plumbed and aligned. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|