The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application including required fire resistance rating are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Passive and active fire control elements for eaves construction are identified and applied. Completed |
Evidence:
|
Install fascia and barge.
|
|
Overhang of rafters is marked and cut to line, plumb and angle. Completed |
Evidence:
|
Gable ends are trimmed for overhang where a verge rafter is not used. Completed |
Evidence:
|
Fascia is fitted and fixed to roof structure overhang to line and level. Completed |
Evidence:
|
Construct framework for eaves or soffits.
|
|
Framework structure for eaves type are identified, and eaves design is established and set out to drawings and specifications. Completed |
Evidence:
|
Timber framework members are set out, marked and cut to lengths in accordance with methods of joining and proposed framework structure. Completed |
Evidence:
|
Boxed eaves constructed with soffit bearers are fixed to wall frame or supported by hangers from rafters, to line and level. Completed |
Evidence:
|
Boxed eaves structure is installed, clear of top of masonry walls in veneer construction to allow for frame shrinkage and settlement. Completed |
Evidence:
|
Eaves structure members are securely fixed, including back blocking and trimmers. Completed |
Evidence:
|
Line and clad eaves and soffits.
|
|
Eaves cladding and sheeting material is marked and cut to shape to suit task application and jointing methods. Completed |
Evidence:
|
Eaves lining, cladding and sheeting are fitted, joined and fixed in accordance with type of material, task application and specifications. Completed |
Evidence:
|
Mouldings are fitted and fixed to specifications to finish eaves. Completed |
Evidence:
|
Sloping eaves are fitted to underside of rafters or framing for fixing and joining of material. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|