The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Straighten and prepare exterior walls.
|
|
Timber frame is checked for straightness and studs are trimmed or packed to provide true surface across studs. Completed |
Evidence:
|
Additional rows of nogging are fitted and fixed to line, flush with wall face and plumb, where specified to facilitate exterior cladding. Completed |
Evidence:
|
Fix edge finishing, flashing and insulation.
|
|
Weatherproofing, vapour barrier and flashing material are cut and fitted into position and secured to specifications. Completed |
Evidence:
|
Location of edge finishing, joiners, corner moulds and flashing is prepared to length and position, and secured to specifications. Completed |
Evidence:
|
Wall insulation is cut and fixed where specified. Completed |
Evidence:
|
Set out, cut and fix horizontal weatherboards.
|
|
Cover for weatherboards is determined from recommended lap, type and profile of board and height of wall. Completed |
Evidence:
|
Gauge rod is produced. Completed |
Evidence:
|
Stop locations of each board or starting board are marked on face to determined or specified position. Completed |
Evidence:
|
Boards are cut to fit length of wall faces. Completed |
Evidence:
|
Butt joints of timber boards are joined at centre of studs with joint flush to face and line. Completed |
Evidence:
|
Other boards are joined using manufacturer recommended joining profiles and fitted to specification. Completed |
Evidence:
|
Material is pre-drilled subject to splitting, and fixed at end junction or butt joints to avoid splitting. Completed |
Evidence:
|
Internal and external corners are finished to manufacturer recommendations and job specifications. Completed |
Evidence:
|
Timber weatherboards, where specified, are prepared with nominated primer to cover overlaps and end joints. Completed |
Evidence:
|
Fix panelling.
|
|
Starting position of first panel is determined in accordance with specified design and finished effect against windows, doors and corners. Completed |
Evidence:
|
Panelling is cut to fit height of wall. Completed |
Evidence:
|
Abutting joints of panelling are fixed to manufacturer specification and requirements for covering flashing. Completed |
Evidence:
|
Panelling is cut, fitted and fixed to manufacturer recommendations and job specification, maintaining plumb and level. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|