The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Set out formwork.
|
|
Design of stairs and/or ramps and method of joining formwork are identified from job drawings and specifications, and are checked to be in accordance with legislation, regulations and codes of practice. Completed |
Evidence:
|
Exit and ground finish levels are determined from plans, specifications and site inspection. Completed |
Evidence:
|
Rise, going and pitch of stairs and ramp are determined from plans, specifications, site inspection, rise measurements and requirements of Building Code of Australia (BCA). Completed |
Evidence:
|
Full size set out of stairs and ramp is calculated and made to determine rise, going and pitch of stairs to provide location of landings, stringers, treads and posts where specified. Completed |
Evidence:
|
Location of stair, ramp and newels are determined from plans, specifications and pitch of stairs or full size set out. Completed |
Evidence:
|
Location of footings are set out to layout of designed stairs and ramp from plans, specifications or full size set out, where specified. Completed |
Evidence:
|
Materials for formwork, including stringers, are selected and set out to pitch of stairs with rises not exceeding specified space between treads. Completed |
Evidence:
|
Assemble and erect formwork.
|
|
Landing bearers and joists are placed, fixed and braced according to plans and specifications, where specified. Completed |
Evidence:
|
Footings are checked for accuracy to requirements of plans and specifications. Completed |
Evidence:
|
Stairs and/or ramp formwork soffit is erected and braced in accordance with plans and specifications. Completed |
Evidence:
|
Formwork stringers are cut square to length and shape in accordance with set out and junction with newel posts, and are installed and braced. Completed |
Evidence:
|
Metal angle brackets are screwed/bolted to formwork strings to set out locations of tread support. Completed |
Evidence:
|
Formwork strings for stairs and ramps are located and fixed according to plans and specifications. Completed |
Evidence:
|
Material for face of treads is set out, cut square to length and fixed to metal angle bracket according to plans and specifications. Completed |
Evidence:
|
Risers are braced at mid-span to prevent deflection under the load of wet concrete. Completed |
Evidence:
|
Newels are erected and temporarily braced to plumb position, where specified. Completed |
Evidence:
|
Formwork tie bolts are located and secured to plans and specifications to maintain stair width where specified. Completed |
Evidence:
|
Strip formwork.
|
|
Formwork and bracing are removed sequentially and safely. Completed |
Evidence:
|
Timber components are de-nailed, cleaned and stored or stacked safely for reuse or removal from site. Completed |
Evidence:
|
Steel components are cleaned, oiled and stored or stacked to manufacturer's maintenance recommendations. Completed |
Evidence:
|
Damaged formwork components are safely discarded after stripping. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |