The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Erect formwork.
|
|
Work area is cleared and surface prepared for safe erection of formwork for suspended slabs, piers and shutters. Completed |
Evidence:
|
Formwork is set out to requirements of plans and specifications. Completed |
Evidence:
|
Formwork is assembled to plans, specifications and class of surface finish, with support system set to correct height level and line. Completed |
Evidence:
|
Bracing of formwork is placed according to support plans and specifications to maintain rigidity and stability. Completed |
Evidence:
|
Formwork support system is sequentially erected according to initial set out to job specifications. Completed |
Evidence:
|
Formwork shutters and/or edge boxing is constructed to designed form requirements and specified dimensions. Completed |
Evidence:
|
Block-outs and cast-in services are installed to specified locations. Completed |
Evidence:
|
Debris, sawdust and other waste materials are removed from completed formwork in accordance with waste management policy for the site. Completed |
Evidence:
|
Release agent is applied to formwork face to manufacturer specifications where specified. Completed |
Evidence:
|
Strip formwork.
|
|
Formwork and bracing/strutting support are removed sequentially and safely. Completed |
Evidence:
|
Timber components are de-nailed, cleaned and stored or stacked safely for reuse or removal from site. Completed |
Evidence:
|
Steel components are cleaned, oiled and stored or stacked to manufacturers' maintenance recommendations. Completed |
Evidence:
|
Damaged formwork components are safely discarded after stripping. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|