The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. Completed |
Evidence:
|
Truck mounted crane is set up and operated.
|
|
Truck mounted crane is positioned at the designated drop off point. Completed |
Evidence:
|
Truck is positioned to ensure a level surface to operate the crane from. Completed |
Evidence:
|
Crane is activated and manoeuvred to its operating position from its lock down position. Completed |
Evidence:
|
Crane movements are checked for safe crane operations. Completed |
Evidence:
|
Load is prepared for lifting in accordance with crane, truck and dogging requirements. Completed |
Evidence:
|
Site is confirmed as clear and safe to receive or dispatch the load. Completed |
Evidence:
|
Load is manoeuvred to position using the control levers to manufacturer specifications. Completed |
Evidence:
|
Load is continually monitored throughout its travel. Completed |
Evidence:
|
Crane is shut down and returned to its lock down position. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|