Evidence Guide: CPCCCO2014A - Carry out concrete work

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCCO2014A - Carry out concrete work

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare.

  1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  3. Signage and barricade requirements are identified and implemented.
  4. Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety (OHS) requirements are followed in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signage and barricade requirements are identified and implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Prepare concreting materials.

  1. Location of steel reinforcement and formwork is determined from drawings and reinforcement schedule.
  2. Reinforcement is checked against reinforcement drawings and specifications.
  3. Formwork components and materials are selected consistent with job.
  4. Fixing and fasteners are selected and used consistent with requirements of the job.
Location of steel reinforcement and formwork is determined from drawings and reinforcement schedule.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reinforcement is checked against reinforcement drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Formwork components and materials are selected consistent with job.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fixing and fasteners are selected and used consistent with requirements of the job.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out for concrete work.

  1. String lines are set accurately from existing pegs.
  2. Grades are checked to ensure correct fall.
  3. Services are identified and protected to prevent damage.
String lines are set accurately from existing pegs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grades are checked to ensure correct fall.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Services are identified and protected to prevent damage.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Construct and install reinforcement.

  1. Reinforcing fabric and bars are cut and bent as required to project drawings and specifications.
  2. Fabric and bars are tied or fixed to configuration from project drawings and specifications.
  3. Stiffening rods are attached to panels as required to facilitate handling.
  4. Reinforcement material is located in formwork and placed on bar chairs/spacers as determined from drawings, noting clearance from formwork.
  5. Cast-in items are located and secured.
Reinforcing fabric and bars are cut and bent as required to project drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Fabric and bars are tied or fixed to configuration from project drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stiffening rods are attached to panels as required to facilitate handling.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Reinforcement material is located in formwork and placed on bar chairs/spacers as determined from drawings, noting clearance from formwork.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cast-in items are located and secured.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect formwork.

  1. Work area is cleared and surface prepared for safe erection of formwork.
  2. Formwork is set out to requirements of drawings and specifications.
  3. Formwork is assembled and erected to specifications.
  4. Debris, sawdust and other waste material are safely removed from formwork.
  5. Form release agent is applied to manufacturer specifications.
Work area is cleared and surface prepared for safe erection of formwork.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Formwork is set out to requirements of drawings and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Formwork is assembled and erected to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Debris, sawdust and other waste material are safely removed from formwork.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Form release agent is applied to manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out concrete work.

  1. Concrete is transported correctly with wheelbarrow and discharged into formwork, using correct manual handling techniques.
  2. Discharge of concrete from concrete pump line and/or chute into the formwork is controlled correctly.
  3. Concrete is placed correctly to instruction and screeded to specified levels and grades.
  4. Concrete is compacted to specification using immersion vibrator or other specified method.
  5. Concrete is finished and curing process applied to specifications.
  6. Control joints are positioned and installed to specification and to current Australian standard or codes.
  7. Dowel joints are positioned to specification.
  8. Concrete surface is adequately covered and protected.
Concrete is transported correctly with wheelbarrow and discharged into formwork, using correct manual handling techniques.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Discharge of concrete from concrete pump line and/or chute into the formwork is controlled correctly.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Concrete is placed correctly to instruction and screeded to specified levels and grades.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Concrete is compacted to specification using immersion vibrator or other specified method.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Concrete is finished and curing process applied to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control joints are positioned and installed to specification and to current Australian standard or codes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dowel joints are positioned to specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Concrete surface is adequately covered and protected.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Strip formwork.

  1. Edge boxing and braces are removed carefully, safely and sequentially.
  2. Timber components are denailed, cleaned and stored or stacked.
  3. Steel components are cleaned, oiled and stored or stacked.
  4. Damaged formwork components are discarded after stripping.
  5. Screens are safely cleaned before movement, where applicable.
Edge boxing and braces are removed carefully, safely and sequentially.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Timber components are denailed, cleaned and stored or stacked.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steel components are cleaned, oiled and stored or stacked.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Damaged formwork components are discarded after stripping.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Screens are safely cleaned before movement, where applicable.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up.

  1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations

comply with organisational policies and procedures including quality requirements

safely and effectively operate and use tools, plant and equipment

communicate and work effectively and safely with others

complete at least three concreting projects (each a minimum of two cubic metres of concrete), incorporating a minimum of two different finishes with at least one project containing angled formwork and bent reinforcement and all projects being completed to job specifications.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

drawings and specifications

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

evaluating own actions and making judgments about performance and necessary improvements

identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials

organisational skills, including the ability to plan and set out work

recognising procedures, following instructions, responding to change and contributing to workplace responsibilities, such as current work site environmental and sustainability frameworks or management systems

teamwork skills to coordinate own work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

concrete characteristics and properties

concreting principles

equipment types, characteristics, technical capabilities and limitations

formwork

general construction terminology

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS)

materials handling methods

operational, maintenance and basic diagnostic procedures

processes for interpreting engineering drawings

quality requirements

site and equipment safety requirements

site isolation and traffic control responsibilities and authorities

steel reinforcement characteristics

structural technology.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

MSDS

memos

regulatory and legislative requirements pertaining to carrying out concrete work

relevant Australian standards

safe work procedures relating to concreting

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Planning and preparation include:

assessment of conditions and hazards

determination of work requirements and safety plans and policies

equipment defect identification

work site inspection.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor

hazard control

hazardous materials and substances

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Tools and equipment include:

bolt cutters

brushes

buckets

chutes

curing agent applicator

edging tools

floats

hammers

hoses

kibble

mesh guillotine

nips

rakes

reinforcement benders

rods

screeds

short handle shovels

shutters

sponges

steam generator

tarpaulins

tremmies

trowels

vibrators

wheelbarrows.

Quality requirements include:

internal company quality policy and standards

manufacturer specifications where specified

relevant regulations, including Australian standards

workplace operations and procedures.

Materials include:

bar chairs

cement

concrete blend

curing compounds

form release agents

formwork components

membranes

pre-mix concrete

sand

steel reinforcing

vapour barriers

water.

Environmental requirements include:

clean-up management

dust and noise

stormwater management

vibration

waste management.

Reinforcement components include:

ligatures

mesh

reinforcement bars and rods.

Formwork includes:

expanded polystyrene

fibreglass

masonry

plywood

steel shutters

structural cardboard

timber.

Cast-in items include:

services and fixtures tied to the reinforcement.

Concreting work includes:

beams

columns

footings

footpaths

lintels

pads

ramps

repairing of kerb and channel

slabs on ground

stairs

structural members

suspended slab

walls.

Transporting of concrete includes:

crane and kibble

pre-mix truck

pumping equipment

wheelbarrow.

Placing of concrete includes:

kibble

pumping equipment

shovelling

tremmies

truck placed

vibrating

wheelbarrow.

Concreting finishing techniques include:

broom finished

brushed

bull float

mechanical trowelling machine

steel trowel

wood float.

Curing includes:

applied moisture

coating with a membrane

curing compound

flooding

plastic sheeting

steam.