The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied. Completed |
Evidence:
|
Safe working area around glass installation is maintained in accordance with site requirements and OHS regulations. Completed |
Evidence:
|
Cut glass to a straight line.
|
|
Type, size and thickness of glass are selected appropriate for application (thickness less than 6.38mm) and location is determined from job drawings, specifications and glazing schedule. Completed |
Evidence:
|
Openings to receive glass are inspected for obstructions and clearances in accordance with standard operating procedures. Completed |
Evidence:
|
Cutting process is identified in accordance with AS1288 Glass in building - Selection and installation, and glass is cut to specification on a line using straight edge and scoring and breaking to run cut to tolerance of ±1mm. Completed |
Evidence:
|
Glass sheets are used in the most economical layout, with cutting defects recognised and corrective action taken. Completed |
Evidence:
|
Sharp edges are removed to provide safe edges to glass. Completed |
Evidence:
|
Circle and hole cutting.
|
|
Type and thickness of glass is selected appropriate for application and centre of hole or circle is set out using edge, rule and permanent marking pen. Completed |
Evidence:
|
Circles and holes in glass are cut to specification using pyramid method, completing pre-cut checks before positioning circle cutter. Completed |
Evidence:
|
Cutting defects are recognised and corrective action is taken in line with standard procedures and according to AS1288, with most economical layout used with glass sheets. Completed |
Evidence:
|
Sharp edges are removed to provide safe edges to glass. Completed |
Evidence:
|
Cut glass to simple shapes.
|
|
Glass to be used is selected and template is marked and prepared to designed shape. Completed |
Evidence:
|
Template is used to mark outline on glass with permanent marking pen. Completed |
Evidence:
|
Glass is cut to shape and size to specification and glass offcuts are removed safely to AS1288 specification. Completed |
Evidence:
|
Cutting defects are recognised and corrective action is taken in line with standard procedures and according to AS1288, with most economical layout used with glass sheets. Completed |
Evidence:
|
Sharp edges are removed to provide safe edges to glass. Completed |
Evidence:
|
Clean up.
|
|
Recyclable material is sorted and stored for collection. Completed |
Evidence:
|
Glass surface and surrounding frame are cleaned and cleared of waste material and assembled according to job specifications, with loose debris and waste material removed and disposed of safely. Completed |
Evidence:
|
Tools and equipment are cleaned, maintained and stored. Completed |
Evidence:
|