The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied. Completed |
Evidence:
|
Select and prepare materials and components.
|
|
Methods of assembling erected stairs are identified and components checked for appropriate locations in stair structure. Completed |
Evidence:
|
Method of assembling and fixing are determined in accordance with stair design and location. Completed |
Evidence:
|
Assemble strings and newels.
|
|
Specific position for stairs is identified, measurements are checked and adjustments made where applicable. Completed |
Evidence:
|
Strings and newels are assembled to design and fixed to specification. Completed |
Evidence:
|
Strings to be fixed to walls are temporarily supported or directly fixed in position to specification. Completed |
Evidence:
|
Install treads and risers.
|
|
Assembled strings and newels are temporarily braced in vertical position. Completed |
Evidence:
|
Treads and risers about newels are fitted and fixed to assembly and flight is checked for true and square. Completed |
Evidence:
|
Intermediate treads and risers are fitted and wedged where applicable to fit tight to housings to specification. Completed |
Evidence:
|
Assemble and install landings.
|
|
Bearers, where applicable, and joists are fitted and fixed to level according to fixing specification. Completed |
Evidence:
|
Nosing and flooring are fitted and fixed to form landing to specified finish and fascia is fitted and fixed to landing according to finish specification. Completed |
Evidence:
|
Install handrail and balustrade.
|
|
Balusters/intermediate railing and handrails are fitted to form stair balustrade according to specification, with balusters checked to ensure plumb fit. Completed |
Evidence:
|
Newels are checked prior to final fixing to ensure plumb fit. Completed |
Evidence:
|
Handrailings are fitted and fixed to wall in accordance with specifications. Completed |
Evidence:
|
Install spiral stair and curved strings.
|
|
Location of stair and first step is accurately marked on floor and central post is erected into true position, fixed at floor and temporarily braced at top. Completed |
Evidence:
|
Initial string section is temporarily supported in place for assembly, and treads and risers are fitted and fixed into position to specification. Completed |
Evidence:
|
Stair is progressively developed with the extending, supporting and fixing of curved string, and completed with head secured to floor/landing, balustrade installed and central post fixed to specifications. Completed |
Evidence:
|
Secure stair to structure and line spandril area.
|
|
Securing of stair to building is carried out during/on completion of assembly. Completed |
Evidence:
|
Spandril, where applicable, is framed, lined and fixed out to specified finish. Completed |
Evidence:
|
Clean up.
|
|
Stair is checked, with marks removed and surfaces left to specified finish. Completed |
Evidence:
|
Area is cleared and waste material removed. Completed |
Evidence:
|
Glue blocks are fitted to treads and risers according to specified locations. Completed |
Evidence:
|
Tools and equipment are cleaned, maintained and stored. Completed |
Evidence:
|