Evidence Guide: CPCCLSF2001A - Licence to erect, alter and dismantle scaffolding basic level

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCLSF2001A - Licence to erect, alter and dismantle scaffolding basic level

What evidence can you provide to prove your understanding of each of the following citeria?

Plan job.

  1. Task to be undertaken is assessed.
  2. Potential workplace hazards are identified.
  3. Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment.
  4. Site information is obtained.
  5. Scaffold, associated equipment and scaffolding equipment are identified from site information and in consultation with appropriate personnel (where applicable).
  6. Safety equipment is identified.
  7. All forces and loads exerted on and by the scaffold and/or scaffolding equipment are determined and calculated.
  8. Appropriate communication methods are identified with appropriate personnel.
Task to be undertaken is assessed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Potential workplace hazards are identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Site information is obtained.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scaffold, associated equipment and scaffolding equipment are identified from site information and in consultation with appropriate personnel (where applicable).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is identified.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All forces and loads exerted on and by the scaffold and/or scaffolding equipment are determined and calculated.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate communication methods are identified with appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select and inspect plant and equipment.

  1. Scaffold, associated equipment and scaffold equipment are selected and inspected according to procedures and site information.
  2. Safety equipment is selected and inspected according to procedures.
  3. All defective Scaffold, associated equipment, scaffold equipment and safety equipment are isolated according to procedures.
  4. All defective Scaffold, associated equipment, scaffold equipment and safety equipment are reported and recorded according to procedures.
  5. Communication equipment is selected and inspected for serviceability (where applicable).
Scaffold, associated equipment and scaffold equipment are selected and inspected according to procedures and site information.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is selected and inspected according to procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All defective Scaffold, associated equipment, scaffold equipment and safety equipment are isolated according to procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All defective Scaffold, associated equipment, scaffold equipment and safety equipment are reported and recorded according to procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Communication equipment is selected and inspected for serviceability (where applicable).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set up task

  1. Appropriate hazard prevention/control measures are applied to the work area according to procedures.
  2. Ground suitability is checked.
  3. Appropriate footings are prepared to support scaffold and scaffold equipment according to procedures and the appropriate standard.
  4. Scaffold and scaffold equipment are prepared for erection according to procedures and the appropriate standard.
  5. Safety equipment is fitted and secured according to procedures (where applicable).
  6. Scaffold and scaffold equipment are positioned for work application and stability according to procedures and the appropriate standard.
Appropriate hazard prevention/control measures are applied to the work area according to procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Ground suitability is checked.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate footings are prepared to support scaffold and scaffold equipment according to procedures and the appropriate standard.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scaffold and scaffold equipment are prepared for erection according to procedures and the appropriate standard.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety equipment is fitted and secured according to procedures (where applicable).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scaffold and scaffold equipment are positioned for work application and stability according to procedures and the appropriate standard.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Erect scaffold and scaffold equipment.

  1. Scaffold and scaffold equipment are erected according to procedures and the appropriate standard.
  2. Work is conducted safely at heights including safe and effective use of safety equipment.
  3. Scaffold and scaffold equipment are erected consistent with site information.
  4. Appropriate communication methods are used to coordinate the tasks.
  5. Completed tasks are inspected for compliance with the appropriate standard.
  6. Handover certificate is completed as required and handed to appropriate personnel.
  7. Excess materials from the work area are removed (where applicable).
Scaffold and scaffold equipment are erected according to procedures and the appropriate standard.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is conducted safely at heights including safe and effective use of safety equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scaffold and scaffold equipment are erected consistent with site information.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Appropriate communication methods are used to coordinate the tasks.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Completed tasks are inspected for compliance with the appropriate standard.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Handover certificate is completed as required and handed to appropriate personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Excess materials from the work area are removed (where applicable).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Dismantle scaffold and scaffold equipment.

  1. Scaffold and scaffold equipment are dismantled according to procedures and the appropriate standard.
  2. Work is conducted safely at heights including safe and effective use of safety equipment.
  3. Scaffold, associated equipment and scaffold equipment are inspected for damage and defects.
  4. All damaged and defective scaffold, associated equipment and scaffold equipment are tagged and isolated according to procedures.
  5. Hazard prevention/control measures are removed (where appropriate).
  6. All damaged and defective scaffold, associated equipment and scaffold equipment are reported and recorded according to procedures and appropriate action taken.
Scaffold and scaffold equipment are dismantled according to procedures and the appropriate standard.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work is conducted safely at heights including safe and effective use of safety equipment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Scaffold, associated equipment and scaffold equipment are inspected for damage and defects.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All damaged and defective scaffold, associated equipment and scaffold equipment are tagged and isolated according to procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Hazard prevention/control measures are removed (where appropriate).

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

All damaged and defective scaffold, associated equipment and scaffold equipment are reported and recorded according to procedures and appropriate action taken.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Successful assessment of this unit meets the competency requirement of the National Standard for licensing Persons Performing High Risk Work.

State/Territory OHS regulators have mandated the use of Assessment Instruments and Instructions for Assessment endorsed by the national body responsible for OHS matters for the assessment of this unit.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

comply with OHS licensing requirements.

effectively communicate and work safely with others in the work area.

effectively apply risk assessment and hazard management procedures at a basic scaffolder level.

effectively complete the planning, erection and dismantling of a scaffolding system, in accordance with procedures, including a minimum of erect and dismantle:

Modular Scaffold with return and ladder access and platform brackets (hop-up brackets)

Bracket Scaffold

Mobile Scaffold

gin wheel

Cantilever Hoist

safety net and static line

safety screen

Scaffold to be of a minimum height of at least 5.0 metres above the supporting surface with full edge protection (includes safety screen) for each work platform including toe boards and handrails.

correctly demonstrate fibre rope bends and hitches.

effectively conduct pre and post operational checks of basic scaffolding.

complete handover certificate as required.

Context of and specific resources for assessment

Assessment of the safe and effective application of knowledge and skill to workplace tasks (performance) must be undertaken using the National OHS endorsed Assessment Instrument

Assessment of performance must be undertaken either in the workplace or in a realistically simulated workplace setting

.Assessors must ensure that the assessment in the workplace is organised to ensure that all the required equipment and materials and a suitable working area is made available to suit the assessment and the workplace

Assessment must occur under standard and authorised work practices, safety requirements and environmental constraints for basic scaffolding

Applicants must have access to:

personal protective equipment (PPE) for the purpose of the Performance Assessment

appropriate safety equipment in safe condition

appropriate scaffolding and associated scaffolding equipment

communication equipment (e.g. fixed channel two way radios) where applicable

appropriate personnel to assist with the erecting and dismantling of scaffold and scaffold equipment.

Method of assessment

Assessment must be conducted using the national OHS endorsed Assessment Instruments. These Instruments provide advice on their application.

Assessment may be in conjunction with the assessment of other units of competency.

The use of 'simulators' in the assessment of this unit of competency is not acceptable.

Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge.

Assessment must confirm a reasonable inference that competency is not only able to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.

Guidance information for assessment

Further information about endorsed Assessment Instruments may be obtained from state/territory OHS regulators.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

ability to calculate Safe Working Load (SWL) and Working Load Limit (WLL)

ability to erect scaffold within the scope of the basic scaffolder

ability to erect, level, plumb and stabilise cantilever hoists and scaffolds

ability to interpret manufacturer's specifications for plant and equipment

ability to work safely at heights

ability to set up fall arrest systems, including safety nets

ability to work safely in confined spaces

accurate interpretation of basic structural charts and structural plans

applying methods for making temporary connection using fibre ropes

correct application of all scaffolding equipment

methods for making temporary connection of guy ropes and static lines using Flexible Steel Wire Rope (FSWR)

verify problems and equipment faults and demonstrate appropriate response.

Required knowledge

Required knowledge for this unit is:

use of appropriate mathematical procedures for estimation and measurement of loads Commonwealth, state or territory OHS legislation and local government regulations, including standards and codes of practice relevant to the full range of techniques for undertaking basic scaffolding activities

knowledge of principles relating to plant and equipment stability

knowledge of types of scaffolding and their application

knowledge of scaffolding erection and dismantling techniques

knowledge of types of hoists, plant and equipment associated with basic scaffolding and their use/s

risk assessment and control, including understanding of the hierarchy of control

estimation of bearing pressures of the full range of soil types and associated ground conditions for setting up plant and equipment

load capabilities of different types of scaffolding constructions

understanding and application of organisational and workplace standards, requirements, policies and procedures for scaffolding

safety equipment applicable to scaffolding

understanding and application of the inspection and maintenance requirements for basic scaffold, associated equipment and scaffold equipment

uses and limitations of tools and equipment, appropriate to scaffolding tasks and activities.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Hazards may include but not limited to:

ground conditions (e.g. ground bearing pressure/s, back filled trenches, underground services, slopes)

overhead hazards (e.g. power lines, service pipes) (minimum clearance distance from powerlines or electrical equipment as determined by relevant state authority or electrical supply authority)

traffic (e.g. pedestrians, vehicles, other plant)

insufficient lighting

environmental conditions (e.g. wind, lightning, storms)

other site specific hazards (e.g. hazardous materials).

Hazard control measures:

Refers to the systematic process of eliminating or reducing the risk to personnel and property through the application of controls.

It includes the application of the hierarchy of control, the six-step preference of control measures to manage and control risk:

elimination

substitution

isolation

engineering control measures

using safe work practices

personal protective equipment.

Appropriate standards may include:

codes of practice

legislation

Australian Standards

manufacturer's specifications

industry standards (where applicable).

Site Information may include, but not be limited to:

local conditions such as access and egress

work method statements

site-specific job safety analyses and other documentation as required

task plans.

Scaffold may include but not limited to:

mobile scaffolding

bracket scaffolding

modular scaffolding, including:

steel

fibreglass and

aluminium frame scaffolding

prefabricated scaffolding.

Associated equipment may include but not limited to:

planks

flexible steel wire rope and fittings.

NB: including identification, uses and connections which may include termination for static lines and guys for cantilever hoists.

ladders

tie tubes and fittings

fibre rope

NB: including identification and uses (natural and synthetic), and connections associated with bends and hitches.

stairways and screening

hand tools, including, but not limited to:

box spanners

hammers

spirit levels

tape measures

scaffold belts

podgers

hammers

wire nips

wrenches

torpedo levels

shovels

spanners

cutters

hammer drills

sledge hammers

wheel barrows and

relevant maintenance equipment.

Scaffolding equipment may include but not limited to:

materials hoists

gin wheels

safety nets

static lines and fittings.

Appropriate personnel may include, but are not limited to:

supervisors

colleagues

managers who are authorised to take responsibility for the workplace or operations

other scaffolders

other site personnel as applicable.

Safety equipment may include but not limited to:

safety harness

energy absorber

lanyard

inertia reel.

Forces and Loads may include, but are not limited to:

dead loads

live loads

static load

dynamic loads

wind loads.

Communication Methods may include but not limited to:

verbal and non-verbal language

written instructions

signage

communication signals

listening

questioning to confirm understanding, and appropriate worksite protocol.

Procedures may include but not limited to:

manufacturer's guidelines (instructions, specifications or checklists)

industry operating procedures, relevant codes of practice

workplace procedures (work instructions, operating procedures, checklists)

reporting and recording procedures such as e.g. equipment defect/s.

Communication equipment may include but is not limited to:

fixed frequency two way radios

mobile phones.

Hazard prevention/control measures may include but not limited to:

safety tags on electrical switches/isolators

safety observer used inside exclusion zone (e.g. Spotter), to include the use of power line warning systems (e.g. Tiger tails)

power disconnected by competent authority where applicable

traffic and pedestrian barricades and controls

safe and adequate access / egress is established

personal protective equipment

adequate illumination.

Ground suitability may include but not limited to:

rough uneven ground

backfilled ground

soft soils

hard compacted soil

rock

bitumen

concrete.

Stability may include but is not limited to:

ground bearing pressure

sole plates/boards

screw jacks

levelling

ties/guys.