Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCPB3027 - Install ceiling insulation products

What evidence can you provide to prove your understanding of each of the following citeria?

Define job requirements.

  1. Identify scope of required installation activities through review of job requirements and inspection of work site.
  2. Assess and control site risks and hazards and communicate and clarify any issues with supervisor.
  3. Identify requirements of workplace procedures for responding to the presence of vermin, asbestos, and dust within the workspace.
  4. Identify required safety equipment and processes by review of work order, risk assessment, Safety Data Sheets (SDS), Safe Use Instruction Sheet (SUIS) and safety legislation.
  5. Identify and review requirements of Australian Standard (AS) AS3999 relating to electrical inspections, safety and installation activities.
  6. Identify and review workplace environmental requirements that relate to the installation activities.
  7. Identify and review workplace emergency response and evacuation procedures as they apply to the site of the installation activities.
  8. Identify and review work instructions and specifications that relate to the installation activities.
Identify scope of required installation activities through review of job requirements and inspection of work site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assess and control site risks and hazards and communicate and clarify any issues with supervisor.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify requirements of workplace procedures for responding to the presence of vermin, asbestos, and dust within the workspace.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify required safety equipment and processes by review of work order, risk assessment, Safety Data Sheets (SDS), Safe Use Instruction Sheet (SUIS) and safety legislation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and review requirements of Australian Standard (AS) AS3999 relating to electrical inspections, safety and installation activities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and review workplace environmental requirements that relate to the installation activities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and review workplace emergency response and evacuation procedures as they apply to the site of the installation activities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Identify and review work instructions and specifications that relate to the installation activities.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan and prepare for installing insulation.

  1. Undertake an electrical risk assessment and prepare an electrical risk assessment report.
  2. Document and submit for approval a Safe Work Method Statement (SWMS) for the worksite, incorporating identified risks and hazards, the outcomes of the electrical risk assessment, electrical isolation procedure and the hazard hierarchy of control.
  3. Plan job incorporating identified requirements of work order, work site, safety legislation, AS 3999, environmental requirements, work instructions and specifications and SWMS.
  4. Confirm that insulating material and insulation requirements meet work instructions and thermal and acoustic performance specifications.
  5. Put in place all requirements of the SWMS.
  6. Select Personal Protective Equipment (PPE), tools, equipment and associated materials, check for serviceability and report for repair or replacement where unserviceable.
Undertake an electrical risk assessment and prepare an electrical risk assessment report.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document and submit for approval a Safe Work Method Statement (SWMS) for the worksite, incorporating identified risks and hazards, the outcomes of the electrical risk assessment, electrical isolation procedure and the hazard hierarchy of control.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plan job incorporating identified requirements of work order, work site, safety legislation, AS 3999, environmental requirements, work instructions and specifications and SWMS.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Confirm that insulating material and insulation requirements meet work instructions and thermal and acoustic performance specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Put in place all requirements of the SWMS.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select Personal Protective Equipment (PPE), tools, equipment and associated materials, check for serviceability and report for repair or replacement where unserviceable.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install ceiling insulation.

  1. Isolate worksite electrical circuits and install safety signage and lock-out tag in accordance with the SWMS.
  2. Undertake installation work in accordance with the SWMS.
  3. Undertake installation work using approved methods of measurement and cutting of insulating material.
  4. Undertake installation work in accordance with requirements of AS 3999 for recessed luminaries and electrical cable.
  5. Undertake installation work in accordance with manufacturers’ specifications and minimise waste.
  6. Install insulation without damage or distortion of the surrounding environment, electrical and other services and in a manner that maximises safety of self and others.
  7. Conduct final inspection to ensure installed ceiling insulation conforms to work instructions, AS 3999 and manufacturers’ specifications.
Isolate worksite electrical circuits and install safety signage and lock-out tag in accordance with the SWMS.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake installation work in accordance with the SWMS.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake installation work using approved methods of measurement and cutting of insulating material.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake installation work in accordance with requirements of AS 3999 for recessed luminaries and electrical cable.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Undertake installation work in accordance with manufacturers’ specifications and minimise waste.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Install insulation without damage or distortion of the surrounding environment, electrical and other services and in a manner that maximises safety of self and others.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Conduct final inspection to ensure installed ceiling insulation conforms to work instructions, AS 3999 and manufacturers’ specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Complete installation.

  1. Clean work area and dispose of, re-use or re-cycle materials following workplace and environmental procedures.
  2. Clean, check, maintain and store tools and equipment in accordance with manufacturer specifications.
  3. Document details of malfunctions, faults, wear or damage to tools and equipment and report for repair or replacement.
  4. Document, distribute and store Statement of Insulation Installation.
Clean work area and dispose of, re-use or re-cycle materials following workplace and environmental procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean, check, maintain and store tools and equipment in accordance with manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document details of malfunctions, faults, wear or damage to tools and equipment and report for repair or replacement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Document, distribute and store Statement of Insulation Installation.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

ELEMENTS

Elements describe the essential outcomes.

PERFORMANCE CRITERIA

Performance criteria describe the performance needed to demonstrate achievement of the element.

1.

Define job requirements.

1.1

Identify scope of required installation activities through review of job requirements and inspection of work site.

1.2.

Assess and control site risks and hazards and communicate and clarify any issues with supervisor.

1.3.

Identify requirements of workplace procedures for responding to the presence of vermin, asbestos, and dust within the workspace.

1.4.

Identify required safety equipment and processes by review of work order, risk assessment, Safety Data Sheets (SDS), Safe Use Instruction Sheet (SUIS) and safety legislation.

1.5.

Identify and review requirements of Australian Standard (AS) AS3999 relating to electrical inspections, safety and installation activities.

1.6.

Identify and review workplace environmental requirements that relate to the installation activities.

1.7.

Identify and review workplace emergency response and evacuation procedures as they apply to the site of the installation activities.

1.8.

Identify and review work instructions and specifications that relate to the installation activities.

2.

Plan and prepare for installing insulation.

2.1.

Undertake an electrical risk assessment and prepare an electrical risk assessment report.

2.2.

Document and submit for approval a Safe Work Method Statement (SWMS) for the worksite, incorporating identified risks and hazards, the outcomes of the electrical risk assessment, electrical isolation procedure and the hazard hierarchy of control.

2.3.

Plan job incorporating identified requirements of work order, work site, safety legislation, AS 3999, environmental requirements, work instructions and specifications and SWMS.

2.4.

Confirm that insulating material and insulation requirements meet work instructions and thermal and acoustic performance specifications.

2.5.

Put in place all requirements of the SWMS.

2.6.

Select Personal Protective Equipment (PPE), tools, equipment and associated materials, check for serviceability and report for repair or replacement where unserviceable.

3.

Install ceiling insulation.

3.1.

Isolate worksite electrical circuits and install safety signage and lock-out tag in accordance with the SWMS.

3.2.

Undertake installation work in accordance with the SWMS.

3.3.

Undertake installation work using approved methods of measurement and cutting of insulating material.

3.4.

Undertake installation work in accordance with requirements of AS 3999 for recessed luminaries and electrical cable.

3.5.

Undertake installation work in accordance with manufacturers’ specifications and minimise waste.

3.6.

Install insulation without damage or distortion of the surrounding environment, electrical and other services and in a manner that maximises safety of self and others.

3.7.

Conduct final inspection to ensure installed ceiling insulation conforms to work instructions, AS 3999 and manufacturers’ specifications.

4.

Complete installation.

4.1.

Clean work area and dispose of, re-use or re-cycle materials following workplace and environmental procedures.

4.2.

Clean, check, maintain and store tools and equipment in accordance with manufacturer specifications.

4.3.

Document details of malfunctions, faults, wear or damage to tools and equipment and report for repair or replacement.

4.4.

Document, distribute and store Statement of Insulation Installation.

Required Skills and Knowledge

ELEMENTS

Elements describe the essential outcomes.

PERFORMANCE CRITERIA

Performance criteria describe the performance needed to demonstrate achievement of the element.

1.

Define job requirements.

1.1

Identify scope of required installation activities through review of job requirements and inspection of work site.

1.2.

Assess and control site risks and hazards and communicate and clarify any issues with supervisor.

1.3.

Identify requirements of workplace procedures for responding to the presence of vermin, asbestos, and dust within the workspace.

1.4.

Identify required safety equipment and processes by review of work order, risk assessment, Safety Data Sheets (SDS), Safe Use Instruction Sheet (SUIS) and safety legislation.

1.5.

Identify and review requirements of Australian Standard (AS) AS3999 relating to electrical inspections, safety and installation activities.

1.6.

Identify and review workplace environmental requirements that relate to the installation activities.

1.7.

Identify and review workplace emergency response and evacuation procedures as they apply to the site of the installation activities.

1.8.

Identify and review work instructions and specifications that relate to the installation activities.

2.

Plan and prepare for installing insulation.

2.1.

Undertake an electrical risk assessment and prepare an electrical risk assessment report.

2.2.

Document and submit for approval a Safe Work Method Statement (SWMS) for the worksite, incorporating identified risks and hazards, the outcomes of the electrical risk assessment, electrical isolation procedure and the hazard hierarchy of control.

2.3.

Plan job incorporating identified requirements of work order, work site, safety legislation, AS 3999, environmental requirements, work instructions and specifications and SWMS.

2.4.

Confirm that insulating material and insulation requirements meet work instructions and thermal and acoustic performance specifications.

2.5.

Put in place all requirements of the SWMS.

2.6.

Select Personal Protective Equipment (PPE), tools, equipment and associated materials, check for serviceability and report for repair or replacement where unserviceable.

3.

Install ceiling insulation.

3.1.

Isolate worksite electrical circuits and install safety signage and lock-out tag in accordance with the SWMS.

3.2.

Undertake installation work in accordance with the SWMS.

3.3.

Undertake installation work using approved methods of measurement and cutting of insulating material.

3.4.

Undertake installation work in accordance with requirements of AS 3999 for recessed luminaries and electrical cable.

3.5.

Undertake installation work in accordance with manufacturers’ specifications and minimise waste.

3.6.

Install insulation without damage or distortion of the surrounding environment, electrical and other services and in a manner that maximises safety of self and others.

3.7.

Conduct final inspection to ensure installed ceiling insulation conforms to work instructions, AS 3999 and manufacturers’ specifications.

4.

Complete installation.

4.1.

Clean work area and dispose of, re-use or re-cycle materials following workplace and environmental procedures.

4.2.

Clean, check, maintain and store tools and equipment in accordance with manufacturer specifications.

4.3.

Document details of malfunctions, faults, wear or damage to tools and equipment and report for repair or replacement.

4.4.

Document, distribute and store Statement of Insulation Installation.

A person who demonstrates competency in this unit must;

Conduct an electrical risk assessment and prepare an electrical risk assessment report.

Plan and install:

bulk insulation in:

a ceiling space with a minimum area of 9 square metres.

The person must provide evidence from each of the above activities that:

satisfies the elements and associated performance criteria and foundation skills of this unit; and

confirms the activities to be in accordance with legislative and workplace requirements specified in Knowledge Evidence.

A person demonstrating competency in this unit must provide evidence to demonstrate knowledge and understanding of the following knowledge evidence items. Each item defines the type and depth of the knowledge required to meet the demands of one or more performance criteria.

Jurisdictional Workplace Health and Safety and environmental legislation and regulations

Workplace requirements for undertaking all aspects of ceiling insulation installation, including interpreting work orders and reporting problems

Procedures to safely use equipment, shift and handle products and materials, and work at heights and in enclosed areas to install ceiling insulation in common situations

Organisational procedures for responding to the presence of pests/vermin, asbestos and dust within an installation workspace

Risks of asbestos containing materials (ACM), and their use in common building materials used in ceiling spaces

Key requirements of legislation, regulation and building codes related to ceiling insulation

Tools and equipment prohibited for use near identified asbestos-containing materials (ACM)

Appropriate PPE and its use in ceiling insulation installation

Safety data sheets (SDS) and Safe Work Method Statements (SWMS) commonly used in ceiling insulation installation

Common health and safety risks associated with handling ceiling insulation products

Emergency response and evacuation procedures relating to ceiling insulation installation

Work instructions and specifications relating to ceiling insulation installation

Electrical risk assessment process, hazard identification and reporting as per Australian Standard (AS) AS 3999 for common ceiling insulation installation

Hierarchy of hazard control as it relates to ceiling insulation installation

Organisational requirements and procedures relating to ceiling insulation installation, including requirements for a systematic approach to planning own work

Key requirements of Australian Standards relating to ceiling insulation, including:

AS/NZS 4859.1 Materials for the thermal insulation of buildings - Testing and labelling of insulation; and

AS/NZS 3000 (with Amd 1) Wiring Rules, in particular Clause 4.5.2.3.

Requirements relating to ceiling insulation installation from AS 3999 for:

personal safety;

electrical risk assessment;

approved processes; and

energy efficiency – new products and technologies.

Specifications of common ceiling installation materials, including R rating and dimensions

Types, safety, characteristics, uses and limitations of common ceiling insulation installation tools and equipment

Type and purpose of lock out tags in ceiling insulation installation

Requirements of AS 3999 for recessed luminaries and electrical cable, in ceiling insulation installation including:

operating temperature limit of electrical cables;

effect on cables partially surrounded by thermal insulation and fully surrounded by thermal insulation;

common wiring systems used in domestic premises indicating the age of the installation;

clearance and restraint methods to retain thermal insulation from recessed down lights and ancillary equipment; and

electrical hazards in roof spaces, including unenclosed connections, unenclosed conductors, damaged cable sheaths and exposed conductors.

Product and process knowledge to identify common problems and predict consequences in ceiling insulation installation

Quality requirements for installation of ceiling insulation material including thermal and acoustic performance

Energy efficiency of common ceiling insulation material types

Methods for measuring and cutting ceiling insulation material

Procedures for conducting a final inspection of a ceiling insulation installation

Workplace procedures for environmental requirements for waste, including waste management and recycling relating to ceiling insulation installation

Procedures for cleaning, checking and maintaining tools and equipment used for ceiling insulation installation

Procedures for dealing with faulty ceiling insulation installation tools and equipment

Procedures for documenting, distributing and storing Statements of Insulation Installation incorporating the format and required information as defined in AS 3999 – Appendix D

Range Statement

Not Applicable