The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied for the scope of work performed. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. Completed |
Evidence:
|
Receive, sort and distribute roof tiling materials.
|
|
Roof tiling products, materials and components are identified and checked for conformity to material schedule, plans, quality requirements and specifications on delivery to site. Completed |
Evidence:
|
Handling characteristics of roof tiling material and components are identified and safe and effective handling techniques are applied in accordance with safe work method statements and workplace procedures. Completed |
Evidence:
|
Fall safety devices are installed to roof perimeter and handled in accordance with regulatory and workplace requirements. Completed |
Evidence:
|
Elevator is handled, assembled and erected at job location to manufacturer specifications and workplace requirements. Completed |
Evidence:
|
Roof surface sarking and batten materials are handled and loaded onto roof and positioned ready for installation in accordance with specified tile and job specifications. Completed |
Evidence:
|
Roof tiling material and components are sorted to suit material type and size, and stacked for ease of identification and retrieval for task sequence. Completed |
Evidence:
|
Roof tiling material and components are transferred, loaded onto roof, supported and evenly distributed. Completed |
Evidence:
|
Handle and remove surplus material from roof.
|
|
Materials are handled safely and effectively according to material safety data sheets (MSDS) and regulatory authorities' requirements. Completed |
Evidence:
|
Hazardous material is identified for separate handling by authorised personnel. Completed |
Evidence:
|
Surplus roof tiling material and components are loaded and transferred from roof to ground. Completed |
Evidence:
|
Materials are stored safely and effectively according to MSDS and requirements of regulatory authorities. Completed |
Evidence:
|
Roof, guttering and downpipes are cleared free of waste and surplus material. Completed |
Evidence:
|
Clean up
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|