The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained for relevant information, confirmed and applied for the scope of work performed. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. Completed |
Evidence:
|
Prepare roof face.
|
|
Fall arrest system is installed to roof perimeter following regulations and workplace requirements. Completed |
Evidence:
|
Elevator is assembled and operated in accordance with manufacturer instructions and workplace procedures. Completed |
Evidence:
|
Roof surface and structure are checked for stability and safe access to roof for tile installation. Completed |
Evidence:
|
Roof surface is set out and sarked to manufacturer recommendations for specified tile and job specifications. Completed |
Evidence:
|
Cut and fix battens.
|
|
Battens are measured and cut using approved work methods and required personal protective equipment. Completed |
Evidence:
|
Battens are fixed using selected fasteners at specified centres according to manufacturer recommendations. Completed |
Evidence:
|
Completed work is checked for correct alignment and fixing. Completed |
Evidence:
|
Install tiles.
|
|
Tiles are loaded onto roof, supported and evenly distributed. Completed |
Evidence:
|
Roof tiles are spread, cut, secured and installed to manufacturer specifications. Completed |
Evidence:
|
Roof tiles are bedded using correct mortar mix, maintaining alignment. Completed |
Evidence:
|
Roof tiles are pointed with mortar to a flush, smooth finish in accordance with job specifications and are installed to manufacturer specifications. Completed |
Evidence:
|
Clean up.
|
|
Roof, guttering and downpipes are cleared free of waste and surplus material. Completed |
Evidence:
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|