The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. Completed |
Evidence:
|
Prepare roof face.
|
|
Fall arrest system is installed to roof perimeter following regulatory and workplace requirements. Completed |
Evidence:
|
Elevator is assembled and operated in accordance with manufacturer instructions and workplace procedures. Completed |
Evidence:
|
Roof surface is set out, sarked and battened to manufacturer recommendations for the specified tile and job specifications. Completed |
Evidence:
|
Roof surface and structure are checked for stability and safe access to roof for tile installation. Completed |
Evidence:
|
Tiles are loaded onto roof, supported and evenly distributed. Completed |
Evidence:
|
Install tiles.
|
|
Roof tiles are spread, cut, secured and installed to manufacturer specifications. Completed |
Evidence:
|
Hip and ridge tiles are bedded using correct mortar mix, maintaining alignment. Completed |
Evidence:
|
Valley, hips, ridges, flexible point plus acrylic finishes and gables are pointed with like-colour mortar to a flush, smooth finish in accordance with job specifications. Completed |
Evidence:
|
Tile roof openings and lay back surfaces and/or facades.
|
|
Opening surrounds are checked for soakers and flashings, and prepared for tiles. Completed |
Evidence:
|
Surrounds and weatherproofing are tiled to job specifications. Completed |
Evidence:
|
Tiles are spread and secured to steep and vertical surfaces, by individual tile fixing to specifications. Completed |
Evidence:
|
Clean up.
|
|
Roof, guttering and downpipes are cleared free of waste and surplus material. Completed |
Evidence:
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|