The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. Completed |
Evidence:
|
Prepare valley section for repair.
|
|
Damaged area is identified and located in accordance with plans and specifications. Completed |
Evidence:
|
Fall arrest system is installed to roof perimeter in accordance with regulatory and workplace requirements. Completed |
Evidence:
|
Tiles to be repaired or replaced are identified from a removed sample. Completed |
Evidence:
|
Damaged tiles are removed to ensure minimum disturbance to remaining roof tiles. Completed |
Evidence:
|
Pointing or mortar is removed ensuring no damage to roof tiles. Completed |
Evidence:
|
Damaged area is left clean and free of loose waste. Completed |
Evidence:
|
Roof structure valleys and flashing installations are checked for soundness and adequacy according to specifications and manufacturer recommendations. Completed |
Evidence:
|
Repair valley sections.
|
|
Damaged structural components of valley section of roof are disassembled and repaired or replaced in accordance with job specifications and manufacturer recommendations. Completed |
Evidence:
|
Roof tie down fixings are replaced or installed to roof structure in accordance with job specifications and manufacturer recommendations. Completed |
Evidence:
|
Replacement valley flashings are fabricated and installed in accordance with job specifications and manufacturer recommendations. Completed |
Evidence:
|
Work area and material surface are cleaned free of debris and waste materials in accordance with workplace procedures. Completed |
Evidence:
|
Replacement and recycled roof tiles are retained and sorted to ensure conformity to requirements in matching original roof tiles to specification. Completed |
Evidence:
|
Loose mortar is removed from roof tile surface and mortar joints are struck to match existing or specified colour of roof tiles. Completed |
Evidence:
|
Replace roof tiles.
|
|
Roof tiles are examined individually to ensure conformity to requirements in matching original tiles. Completed |
Evidence:
|
Mortar is mixed to required composition to match original specifications. Completed |
Evidence:
|
Roof tiles are laid to maintain conformity to original gauge and alignment, while maintaining bond to specifications. Completed |
Evidence:
|
Roof tiles are laid to produce designed features in accordance with original design and specifications. Completed |
Evidence:
|
Replace pointing material.
|
|
Pointing material is prepared and distributed for use to design specifications. Completed |
Evidence:
|
Pointing material is applied to ridge tile joints to specification. Completed |
Evidence:
|
Joints are pointed to produce matching finish to existing surrounds, and loose material is removed from roof tile surface. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|