The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. Completed |
Evidence:
|
Prepare roof surface.
|
|
Fall arrest system is installed to roof perimeter by regulatory and workplace requirements. Completed |
Evidence:
|
Elevator is assembled and used in accordance with manufacturer instructions and workplace procedures. Completed |
Evidence:
|
Roof surface is set out, sarked, boarded and battened as required by job specifications. Completed |
Evidence:
|
Roof surface and structure are checked for stability and safe access to roof for tile installation. Completed |
Evidence:
|
Tiles are loaded onto roof, supported and evenly distributed. Completed |
Evidence:
|
Prepare slate.
|
|
Slate is graded, marked and holed to alignment requirements. Completed |
Evidence:
|
Slate is loaded on to roof, supported and evenly distributed. Completed |
Evidence:
|
Lay and secure slate.
|
|
Slate is laid and secured to designed layout of gauge, bond and line. Completed |
Evidence:
|
Ridges and hips are finished in accordance with placement of slate to specifications. Completed |
Evidence:
|
Hip covering is installed, measured, prepared, fitted and secured to specifications. Completed |
Evidence:
|
Roof and guttering are cleared free of waste and surplus material. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|