The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. Completed |
Evidence:
|
Prepare roof face.
|
|
Run-off devices are installed and maintained as appropriate to the task. Completed |
Evidence:
|
Fall arrest system is installed to roof perimeter by regulatory and workplace requirements. Completed |
Evidence:
|
Elevator is assembled and operated in accordance with manufacturer instructions and workplace procedures. Completed |
Evidence:
|
Roof surface is set out, sarked and boarded where required to job specifications. Completed |
Evidence:
|
Battens are cut, fitted and fixed to line and spacing to shingle manufacturer and job specifications. Completed |
Evidence:
|
Metal valley sheets are laid and fixed into place by nailing on edge extremities. Completed |
Evidence:
|
Protrusions for installation of flashing are prepared with covered roof surface. Completed |
Evidence:
|
Install shingles/shakes.
|
|
Shingles/shakes are loaded, supported and evenly distributed on roof. Completed |
Evidence:
|
Sarking is laid below initial course of shingles/shakes to job specifications. Completed |
Evidence:
|
Shingles/shakes are fixed in line, with spacing between and guttering overhang to standards and job specifications. Completed |
Evidence:
|
Subsequent courses are laid with sarking and shingles fixed to standards and job specifications. Completed |
Evidence:
|
Staggered joints are maintained with overlapping shingles/shakes to job specifications. Completed |
Evidence:
|
Shingles/shakes are split and cut to form junctions with walls or roof surfaces. Completed |
Evidence:
|
Valleys are finished to specifications. Completed |
Evidence:
|
Gable ends are finished to line and specified overhang. Completed |
Evidence:
|
Finish hips and ridges.
|
|
Same size shingles/shakes are selected for hips and ridges. Completed |
Evidence:
|
Edges of shingles/shakes are bevel cut to provide butt joints in capping sections. Completed |
Evidence:
|
Hips and ridges are covered, fixed and finished to line. Completed |
Evidence:
|
Clad walls and facades.
|
|
Method of finishing shingles/shakes on wall or facade is identified from specifications. Completed |
Evidence:
|
Sheathed surfaces are sheeted and fixed to framework. Completed |
Evidence:
|
Wall or facade is set out to spacing for battens and exposure of shingles/shakes is specified. Completed |
Evidence:
|
Sarking and shingles/shakes are fitted according to specified method for fixing. Completed |
Evidence:
|
Junctions are constructed at corners to specified finishes. Completed |
Evidence:
|
Flashings are finished to job specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|