The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCSG3017 - Erect and install signs

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare for installation processes.

  1. Job requirements are identified from work instructions and confirmed with relevant personnel.
  2. Characteristics and dimensions of sign are identified and weight of sign is calculated and applied to planning.
  3. Research is undertaken to determine the need for local authority permits to install sign, client is informed, and relevant permissions obtained or sighted before starting work.
  4. Detailed installation drawings are obtained and confirmed.
  5. Tools and equipment are selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.
  6. Health and safety requirements are identified and applied to planning.
  7. Sequence of tasks is determined and confirmed with relevant personnel.
Job requirements are identified from work instructions and confirmed with relevant personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Characteristics and dimensions of sign are identified and weight of sign is calculated and applied to planning.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Research is undertaken to determine the need for local authority permits to install sign, client is informed, and relevant permissions obtained or sighted before starting work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Detailed installation drawings are obtained and confirmed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Health and safety requirements are identified and applied to planning.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Sequence of tasks is determined and confirmed with relevant personnel.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1

Plan and prepare for installation processes.

1.1

Job requirements are identified from work instructions and confirmed with relevant personnel.

1.2

Characteristics and dimensions of sign are identified and weight of sign is calculated and applied to planning.

1.3

Research is undertaken to determine the need for local authority permits to install sign, client is informed, and relevant permissions obtained or sighted before starting work.

1.4

Detailed installation drawings are obtained and confirmed.

1.5

Tools and equipment are selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.

1.6

Health and safety requirements are identified and applied to planning.

1.7

Sequence of tasks is determined and confirmed with relevant personnel.

2

Assess installation site.

2.1

Work site is assessed and need for engineering risk assessment is identified with relevant personnel and obtained where appropriate to confirm structural integrity of supporting background before starting work.

2.2

Site plans are sourced and location of assets, services and infrastructure beneath and around installation site are identified.

2.3

Condition of surface is assessed and need for remedial work is identified.

2.4

Remedial work if required is undertaken or referred to relevant personnel for action according to job requirements.

3

Prepare to secure sign.

3.1

Surface is cleaned and prepared according to planned material application.

3.2

Sign is positioned on site, checked for quality, and identified faults are rectified before installation.

4

Secure sign to surface, as required.

4.1

Location for sign is confirmed against drawings and position is marked out for installation.

4.2

Marked locations are checked to be level and errors in measurements and calculations are rectified before sign is installed.

4.3

Sign is positioned and secured with fasteners and fixings according to manufacturer specifications, specified tolerances, job requirements and safety procedures.

5

Secure freestanding sign, as required.

5.1

Location for support materials is marked out on site according to job requirements.

5.2

Footings for sign are created to specified depth according to job requirements and sign characteristics.

5.3

Anchor bolts are inserted and holes are filled with concrete and finished to job requirements.

5.4

Support poles are inserted, fixed into position, and checked for levelling using levelling tools.

5.5

Sign is secured to poles using specified fastenings and fixings, and checked for stability, and faults are rectified or reported to relevant personnel.

6

Finalise work and clean up.

6.1

Installation is checked to ensure it is level, and faults in installation process are identified and rectified or reported to relevant personnel.

6.2

Appropriate colour and type of paint are applied to visible fastenings and fixings to a professional standard and according to job requirements.

6.3

Sign and surrounding area are cleaned and waste materials are removed according to statutory and regulatory authority requirements.

6.4

Tools and equipment, including personal protective equipment (PPE), are cleaned, maintained and stored according to workplace requirements.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1

Plan and prepare for installation processes.

1.1

Job requirements are identified from work instructions and confirmed with relevant personnel.

1.2

Characteristics and dimensions of sign are identified and weight of sign is calculated and applied to planning.

1.3

Research is undertaken to determine the need for local authority permits to install sign, client is informed, and relevant permissions obtained or sighted before starting work.

1.4

Detailed installation drawings are obtained and confirmed.

1.5

Tools and equipment are selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.

1.6

Health and safety requirements are identified and applied to planning.

1.7

Sequence of tasks is determined and confirmed with relevant personnel.

2

Assess installation site.

2.1

Work site is assessed and need for engineering risk assessment is identified with relevant personnel and obtained where appropriate to confirm structural integrity of supporting background before starting work.

2.2

Site plans are sourced and location of assets, services and infrastructure beneath and around installation site are identified.

2.3

Condition of surface is assessed and need for remedial work is identified.

2.4

Remedial work if required is undertaken or referred to relevant personnel for action according to job requirements.

3

Prepare to secure sign.

3.1

Surface is cleaned and prepared according to planned material application.

3.2

Sign is positioned on site, checked for quality, and identified faults are rectified before installation.

4

Secure sign to surface, as required.

4.1

Location for sign is confirmed against drawings and position is marked out for installation.

4.2

Marked locations are checked to be level and errors in measurements and calculations are rectified before sign is installed.

4.3

Sign is positioned and secured with fasteners and fixings according to manufacturer specifications, specified tolerances, job requirements and safety procedures.

5

Secure freestanding sign, as required.

5.1

Location for support materials is marked out on site according to job requirements.

5.2

Footings for sign are created to specified depth according to job requirements and sign characteristics.

5.3

Anchor bolts are inserted and holes are filled with concrete and finished to job requirements.

5.4

Support poles are inserted, fixed into position, and checked for levelling using levelling tools.

5.5

Sign is secured to poles using specified fastenings and fixings, and checked for stability, and faults are rectified or reported to relevant personnel.

6

Finalise work and clean up.

6.1

Installation is checked to ensure it is level, and faults in installation process are identified and rectified or reported to relevant personnel.

6.2

Appropriate colour and type of paint are applied to visible fastenings and fixings to a professional standard and according to job requirements.

6.3

Sign and surrounding area are cleaned and waste materials are removed according to statutory and regulatory authority requirements.

6.4

Tools and equipment, including personal protective equipment (PPE), are cleaned, maintained and stored according to workplace requirements.

A person who demonstrates competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit, and must erect and install two signs as follows:

one sign must measure at least 1200 x 2400 mm, be constructed of aluminium no more than 5 mm thick, and be fixed using appropriate fixings and fastenings to one of the following surfaces:

acrylic

glass

masonry

metal

plasterboard

plastic

timber

one sign must measure at least 1200 x 2400 mm, be constructed of aluminium no more than 5 mm thick, and be positioned as a freestanding sign to two aluminium posts or poles measuring no less than 90 x 90 mm.

In doing the above work, the person must:

check and confirm the need for planning permissions to install the signs in specified location

check and confirm the site for services and assets below ground

assess the sign installation requirements relevant to the work site, identifying potential risks and hazards and demonstrating measures to mitigate potential work site risks and hazards

ensure the structural integrity of the supporting background, including taking steps to ensure reinforcement is arranged if required

follow safety procedures when erecting and installing above signs

identify and select methods for erecting and installing above signs, including selecting tools, fasteners and fixings giving consideration to the characteristics of the signs

prepare the work site for installation and install the signs according to job requirements.

A person demonstrating competency in this unit must demonstrate knowledge of:

purpose and application of the following when erecting and installing signs:

safety data sheets (SDS)

safe work method statements (SWMS)

effect of mechanical and chemical fixings and fastenings used to install signs on different surfaces

load bearing specifications for a range of fastener and fixing measurements and calculations relating to material quantities

relevant Australian and New Zealand standards in relation to the installation of signs, including:

AS/NZS 3832 Electrical installations – Cold-cathode illumination systems

AS 1319 Safety signs for the occupational environment

statutory and regulatory authority requirements, particularly those relating to:

removal of waste products

storage of chemicals and materials

types and uses of tools and equipment used for installing signs

processes and practices for working safely around power sources, services and assets.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Tools and equipment must include:

chamois

drills

ladder

levelling tools

measuring tapes and rules

post hole digger

PPE suited to installing signs

touch-up paint.

Health and safety requirements must include:

selection, correct fitting, and use of PPE prescribed under legislation, regulations and workplace policies and practices

emergency procedures, including:

evacuation

first aid

location and use of fire-fighting equipment

hazard identification and risk control procedures

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

concealed services (water, power and gas)

lighting

restricted access barriers

traffic control

work site visitors and the public

working in confined spaces

working in proximity to others

use of machines

use of tools and equipment

workplace environmental requirements.

Fasteners and fixings must include:

all of the following chemical products:

construction adhesive

injection systems

spin capsules

hammer-in capsules

and five or more of the following:

electrical clips

nylon anchors

hollow wall anchors

plastic toggles

metal toggles

multi-clips

lug anchors

steel ferrule expanding bolts

metal screws

chipboard screws

plasterboard screws.