Evidence Guide: CPCCSH3003 - Assemble and install shopfront structures

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCSH3003 - Assemble and install shopfront structures

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare.

  1. Job requirements are obtained, confirmed and applied to planning.
  2. Work site is inspected, conditions and hazards are identified and reported as required, and health and safety requirements are confirmed with relevant personnel and applied to planning.
  3. Tools and equipmentare selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.
  4. Delivered shopfront components, sections and fittings are checked for completeness, unloaded carefully to protect finishes, and placed in well protected area on site.
  5. Arrangements are made for placement of mobile scaffolding, elevated work platforms or scissor lifts as required, according to client and workplace requirements.
  6. Bulkhead is prepared for installation by drilling, cutting and routering holes and openings to accept fittings and fixtures.
Job requirements are obtained, confirmed and applied to planning.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Work site is inspected, conditions and hazards are identified and reported as required, and health and safety requirements are confirmed with relevant personnel and applied to planning.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipmentare selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Delivered shopfront components, sections and fittings are checked for completeness, unloaded carefully to protect finishes, and placed in well protected area on site.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Arrangements are made for placement of mobile scaffolding, elevated work platforms or scissor lifts as required, according to client and workplace requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Bulkhead is prepared for installation by drilling, cutting and routering holes and openings to accept fittings and fixtures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1

Plan and prepare.

1.1

Job requirements are obtained, confirmed and applied to planning.

1.2

Work site is inspected, conditions and hazards are identified and reported as required, and health and safety requirements are confirmed with relevant personnel and applied to planning.

1.3

Tools and equipmentare selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.

1.4

Delivered shopfront components, sections and fittings are checked for completeness, unloaded carefully to protect finishes, and placed in well protected area on site.

1.5

Arrangements are made for placement of mobile scaffolding, elevated work platforms or scissor lifts as required, according to client and workplace requirements.

1.6

Bulkhead is prepared for installation by drilling, cutting and routering holes and openings to accept fittings and fixtures.

2

Check opening and make ready for installation.

2.1

Datum is struck to check levels against supplied components, and plumb lines are marked at all connecting points and compared to original site measurements.

2.2

Shopfront opening and shopfront component dimensions are checked and compared to installation specifications.

2.3

Position of lease line is confirmed from certified and stamped site and construction plans for lease line and boundaries, installation specifications, or building contractor.

2.4

Irregularities in plumb lines or dimensions are reported or rectified according to workplace procedures.

2.5

Opening is prepared, protrusions removed, and support and bracing are installed as required to prevent collapsing elements and falling debris according to job requirements.

2.6

Shopfront is checked for services located within the structure and upgrades are arranged if required prior to shopfront installation.

2.7

Narrowest part of opening is determined and sill packing is set up to specified level for installation according to AS 2047 Windows and external glazed doors in buildings.

3

Prepare and check shopfront assembly.

3.1

Components, fittings and pre-assembled frames are assembled and placed into position to commence installation.

3.2

Holes are drilled into shopfront components in positions suitable for installing fixings to connect to brickwork, timber or stone.

3.3

Measurements of completed assembly and glazing order are checked against opening, and glazier is notified of changes as required.

4

Install assembly.

4.1

Bulkhead is raised into position using mechanical lifting equipment and secured to installed structure using fixing methods required to securely support installation.

4.2

Assembly is positioned into opening and braced allowing it to rest on packing at highest position in floor.

4.3

Datum line is transferred onto assembly and position is measured and transferred to all connecting points.

4.4

Assembly is installed to level using appropriate equipment for levelling process, plumbed off narrowest point of width, and packed to position.

4.5

Assembly is anchored at all connecting points according to specifications, doors are fitted and checked as square where applicable, and glazier is notified that assembly is ready for glass installation.

4.6

Door closures are checked to ensure that they face mount, floor or transom and that automatic and floor or head-fixed tracks operate freely.

4.7

Closures, door furniture and scribe fillers are fitted and any remaining gaps are sealed with approved sealant.

4.8

Sealants are applied to whole assembly according to specifications.

5

Clean up.

5.1

Assembly is cleaned free from excess sealant, marks and masking tape.

5.2

Waste is disposed of safely, aluminium off-cuts are stored for recycling, and unused material is stored according to workplace requirements.

5.3

Tools and equipment are cleaned, maintained and stored according to workplace requirements.

Required Skills and Knowledge

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1

Plan and prepare.

1.1

Job requirements are obtained, confirmed and applied to planning.

1.2

Work site is inspected, conditions and hazards are identified and reported as required, and health and safety requirements are confirmed with relevant personnel and applied to planning.

1.3

Tools and equipmentare selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work.

1.4

Delivered shopfront components, sections and fittings are checked for completeness, unloaded carefully to protect finishes, and placed in well protected area on site.

1.5

Arrangements are made for placement of mobile scaffolding, elevated work platforms or scissor lifts as required, according to client and workplace requirements.

1.6

Bulkhead is prepared for installation by drilling, cutting and routering holes and openings to accept fittings and fixtures.

2

Check opening and make ready for installation.

2.1

Datum is struck to check levels against supplied components, and plumb lines are marked at all connecting points and compared to original site measurements.

2.2

Shopfront opening and shopfront component dimensions are checked and compared to installation specifications.

2.3

Position of lease line is confirmed from certified and stamped site and construction plans for lease line and boundaries, installation specifications, or building contractor.

2.4

Irregularities in plumb lines or dimensions are reported or rectified according to workplace procedures.

2.5

Opening is prepared, protrusions removed, and support and bracing are installed as required to prevent collapsing elements and falling debris according to job requirements.

2.6

Shopfront is checked for services located within the structure and upgrades are arranged if required prior to shopfront installation.

2.7

Narrowest part of opening is determined and sill packing is set up to specified level for installation according to AS 2047 Windows and external glazed doors in buildings.

3

Prepare and check shopfront assembly.

3.1

Components, fittings and pre-assembled frames are assembled and placed into position to commence installation.

3.2

Holes are drilled into shopfront components in positions suitable for installing fixings to connect to brickwork, timber or stone.

3.3

Measurements of completed assembly and glazing order are checked against opening, and glazier is notified of changes as required.

4

Install assembly.

4.1

Bulkhead is raised into position using mechanical lifting equipment and secured to installed structure using fixing methods required to securely support installation.

4.2

Assembly is positioned into opening and braced allowing it to rest on packing at highest position in floor.

4.3

Datum line is transferred onto assembly and position is measured and transferred to all connecting points.

4.4

Assembly is installed to level using appropriate equipment for levelling process, plumbed off narrowest point of width, and packed to position.

4.5

Assembly is anchored at all connecting points according to specifications, doors are fitted and checked as square where applicable, and glazier is notified that assembly is ready for glass installation.

4.6

Door closures are checked to ensure that they face mount, floor or transom and that automatic and floor or head-fixed tracks operate freely.

4.7

Closures, door furniture and scribe fillers are fitted and any remaining gaps are sealed with approved sealant.

4.8

Sealants are applied to whole assembly according to specifications.

5

Clean up.

5.1

Assembly is cleaned free from excess sealant, marks and masking tape.

5.2

Waste is disposed of safely, aluminium off-cuts are stored for recycling, and unused material is stored according to workplace requirements.

5.3

Tools and equipment are cleaned, maintained and stored according to workplace requirements.

A person who demonstrates competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit, and must assemble and install a shopfront structure, including bulkhead.

In doing the above work, the person must:

comply with safety requirements and health and safety regulations applicable to workplace operations

apply organisational quality procedures and processes in the context of assembling and installing a shopfront

identify design required for assembly and installation of shopfront, including:

shopfront design

design of delivered assemblies, components and fittings

component and shopfront assembly diagram

identify and select components and fittings to match locations in assembled shopfront

select and use processes, tools and equipment to assemble and install nominated shopfront structure

prepare building structure to receive installation of shopfront

safely and efficiently:

assemble sections, components and fittings

install bulkhead into position

locate and install assembly into place

install components and fittings and, where applicable, check that assembled shopfront operates as specified

identify typical faults and problems that occur and action required to rectify them

communicate with others to ensure safe and effective workplace operations.

A person demonstrating competency in this unit must demonstrate knowledge of:

Australian standards, including AS 2047 Windows and external glazed doors in buildings

basic structures and components of walls and ceiling

content of and terms and symbols used in relevant drawings and specifications

contents of and terms used in job safety analyses (JSA) and safe work method statements (SWMS)

design and construction processes for shopfronts

organisation’s quality assurance requirements relating to assembling and installing shopfront structures

workplace and equipment safety requirements relating to assembling and installing shopfront structures.

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Job requirements must include:

job specifications for assembling and installing bulkheads and shopfront components, including:

details of the components and installation specifications

details of materials and fixings for the installation

quality requirements for the completed work

timeframe for completion

JSA or SWMS for tasks

workplace procedures incorporating requirements of relevant legislation, regulations, codes and Australian standards

workplace and work site environmental and sustainability requirements, including:

clean-up management

dust and noise management

waste management.

Health and safety requirements must include:

selection, correct fitting, and use of personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices

emergency procedures, including:

evacuation

first aid

location and use of firefighting equipment

hazard identification and risk control procedures, including installation of restricted access barriers and hoardings

safe operating procedures, including:

safety data sheets (SDS)

manufacturer specifications

manual handling techniques

use of signage and barricades

requirements for:

concealed services (water, power and gas)

lighting

work site visitors and the public

working at heights

working in proximity to others

selection and use of tools and equipment

identifying, safe handling, securing and labelling of hazardous materials

workplace environmental requirements.

Tools and equipment must include ten or more of the following:

air compressor and hoses

brushes

chalk lines

clamps

grinders

hammers

levelling equipment, including spirit levels

lifting plant

measuring tapes and rules

nail guns

plumb bobs

power drills

power leads

sash cramps

screwdrivers

squares

step ladders

straight edge.