The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied. Completed |
Evidence:
|
Fittings and/or pre-assembled frames are unloaded carefully to protect finishes and are placed in well protected area until ready to reassemble. Completed |
Evidence:
|
Establish datum and plumb lines.
|
|
Datum is struck for level as required for installation. Completed |
Evidence:
|
Plumb lines are marked at all connecting points. Completed |
Evidence:
|
Prepare opening.
|
|
Opening dimensions are checked in accordance with dimensions of fabrication and plumb lines are checked for similarity to original site measurement. Completed |
Evidence:
|
Drawings are checked for position of lease line or where unavailable checked with building contractor. Completed |
Evidence:
|
Protrusions are scraped, chipped and cut away to connecting points to facilitate installation. Completed |
Evidence:
|
Narrowest part of opening is determined and sill packing is set up to specified level for installation that to conforms to AS2047 Windows in buildings. Completed |
Evidence:
|
Assemble shopfront.
|
|
Fittings are placed into position to commence installation. Completed |
Evidence:
|
Holes are pre-drilled for fixing positions suitable to connect to brickwork, timber and stone. Completed |
Evidence:
|
Measurements of completed assembly are checked against opening and glazier is contacted for site measurements. Completed |
Evidence:
|
Fit bulkhead.
|
|
Bulkhead is prepared for installation by drilling, cutting and routering holes and openings to accept fittings and fixtures. Completed |
Evidence:
|
Scaffolding is erected to fit bulkhead into position. Completed |
Evidence:
|
Bulkhead is raised into position using mechanical lifting equipment and secured to specifications using fixing methods required to securely support installation. Completed |
Evidence:
|
Install assembly.
|
|
Door are checked for square to ensure glazier has blocked glass correctly and assembly is positioned into opening allowing it to rest on packing at highest position in floor. Completed |
Evidence:
|
Datum line is transferred on assembly and position is measured and transferred to all connecting points. Completed |
Evidence:
|
Assembly is installed to level using appropriate equipment for levelling process, plumbed off narrowest point of width and packed to position. Completed |
Evidence:
|
Assembly is anchored at all connecting points to specifications, doors are fitted where applicable and glazier is contacted to notify that assembly is ready for glass installation. Completed |
Evidence:
|
Door closures are checked to ensure that they face mount, floor or transom and that automatic and floor or head-fixed tracks operate freely. Completed |
Evidence:
|
Closures, door furniture and scribe fillers are fitted and any remaining gaps are sealed with approved sealant. Completed |
Evidence:
|
Sealants are applied to specification to protect against water, wind and dust penetration. Completed |
Evidence:
|
Clean up.
|
|
Assembly is cleaned free from excess sealant, finger marks and masking tape. Completed |
Evidence:
|
Waste and unwanted material are disposed of safely with any waste aluminium stored for recycling and any unused material stored/stacked. Completed |
Evidence:
|
Tools and equipment are cleaned, maintained and stored. Completed |
Evidence:
|