The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare work.
|
|
Quality assurance requirements of signage operations are recognised and adhered to. Completed |
Evidence:
|
Safety (OHS) requirements in accordance with application tasks and workplace operations are recognised and adhered to. Completed |
Evidence:
|
Job requirements are identified from drawings, specifications, instructions and client briefs. Completed |
Evidence:
|
Product range is assessed and selected in accordance with job requirements and relevant Australian standards. Completed |
Evidence:
|
Tools and equipment and materials are selected to carry out tasks consistent with job requirements. Completed |
Evidence:
|
Routine maintenance requirements of equipment are identified and implemented in accordance with workplace and quality assurance procedures. Completed |
Evidence:
|
Temporary or permanent application of materials is determined from job requirements. Completed |
Evidence:
|
Work with materials and equipment.
|
|
LED materials are selected according to job specifications. Completed |
Evidence:
|
Correct type of routing tools and equipment to be used is selected according to job specifications. Completed |
Evidence:
|
Cutter types and their applications are identified for the specified job. Completed |
Evidence:
|
Appropriate routing systems are used to rout LED installation. Completed |
Evidence:
|
Install LED system.
|
|
LED system is installed according to manufacturer specifications. Completed |
Evidence:
|
LED bulbs and wiring is placed into correct position. Completed |
Evidence:
|
Wires are marked ready for connection to power source in consideration of characteristics of electric supply. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleaned and waste materials removed in accordance with statutory and regulatory authority requirements. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are cleaned, maintained and stored. Completed |
Evidence:
|