Evidence Guide: CPCCSP3004A - Restore and renovate solid plasterwork

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCSP3004A - Restore and renovate solid plasterwork

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare.

  1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
  2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  3. Signage and barricade requirements are identified and implemented.
  4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  5. Run off devices are installed and maintenance processes applied if appropriate to the task.
  6. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety (OHS) requirements are followed in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signage and barricade requirements are identified and implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Run off devices are installed and maintenance processes applied if appropriate to the task.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Select restoration or renovation method.

  1. Extent and type of restoration or renovation required are identified by site examination and from plans and specifications.
  2. Drawing and template of damaged area are prepared to profile/moulding shape of existing work.
Extent and type of restoration or renovation required are identified by site examination and from plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Drawing and template of damaged area are prepared to profile/moulding shape of existing work.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Restore plasterwork.

  1. Materials are mixed and prepared for use according to quality requirements.
  2. Damaged plasterwork is restored to original condition or specifications in accordance with plans and specifications.
  3. Damaged cement or plaster mould work is restored to original condition in accordance with plans and specifications.
  4. Textured finishes are applied to match original surfaces, details and alignment.
Materials are mixed and prepared for use according to quality requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Damaged plasterwork is restored to original condition or specifications in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Damaged cement or plaster mould work is restored to original condition in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Textured finishes are applied to match original surfaces, details and alignment.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Renovate lettering and monograms.

  1. Surface for renovation is prepared to architect's specifications.
  2. Monograms and lettering panels are constructed in sand and cement mortar to match detail for restorations.
  3. Materials are applied to fine finish, with sharp arises, square returns and plumb/level according to requirements or job drawings.
Surface for renovation is prepared to architect's specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Monograms and lettering panels are constructed in sand and cement mortar to match detail for restorations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials are applied to fine finish, with sharp arises, square returns and plumb/level according to requirements or job drawings.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up.

  1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply of relevant information, standards and specifications

comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools and equipment

communicate and work effectively and safely with others

restore solid plasterwork to specification on a minimum of three tasks, including:

one curved surface

one ceiling

one archway or column

renovate lettering to specification where the task requires the preparation and use of significant moulds.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

follow instructions

read and interpret:

documentation from a variety of sources

drawings and specifications

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS)

materials storage and environmentally friendly waste management

plans, drawings and specifications

plastering tools and equipment types, characteristics, uses and limitations

processes for the calculation of material requirements

quality requirements

solid plastering terminology

solid plastering, restoration and renovation techniques

systems and techniques for safe handling of materials

types, characteristics, uses and limitations of solid plastering materials and components

workplace and equipment safety requirements.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

1.1. Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

MSDS

memos

regulatory and legislative requirements pertaining to the restoration and renovation of solid plasterwork

relevant Australian standards

safe work procedures relating to the restoration and renovation of solid plasterwork

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

1.2. Scope of work:

restoration may be to lime mortar or cement render surface and includes straight or curved walls, straight or curved ceilings, chimneys and archways

renovation includes lettering and monograms.

1.3. Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor

hazard control

hazardous materials and substances, including cement and curing agents

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

lighting

power equipment

power leads and sources

trip hazards

work site visitors and the public

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

1.4. Tools and equipment:

include:

brushes

buckets

floats

grinders

hammers

hawks

joint rules

mason's squares

measuring tapes and rules

mortar boards and stands

plumb bobs

power leads

screed boards

shovels

sieves

small tools

spirit levels

squares

straight edges

tin snips

trowels

wheelbarrows

may include:

concrete mixers

metal files

scaffolding

wood saws.

1.5. Environmental requirements include:

clean-up management

dust and noise

stormwater protection

waste management.

1.6. Statutory and regulatory authorities include:

federal, state and local authorities administering the applicable Acts, regulations and codes of practice.

1.7. Materials include:

casing beads

corner beads

finish coats

lime

lime putty

plaster compounds

render and setting coats mix composition, including additives such as plasticisers, colour and waterproofing agents

sand.

1.8. Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications

workplace operations and procedures.