The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. Completed |
Evidence:
|
Prepare work area for application processes.
|
|
Work area and substrate are prepared for installation of pre-cast mouldings according to plans and specifications. Completed |
Evidence:
|
Substrate is checked for conformance in accordance with the relevant Australian standard and appropriate fixing methods. Completed |
Evidence:
|
Fix and stop pre-cast moulded archways.
|
|
Plasterboard wall sheets are confirmed to be in accordance with plans and specifications. Completed |
Evidence:
|
Archway profile is set out and cut to architect's drawings and specifications. Completed |
Evidence:
|
Timber arch soffit templates are cut and fixed to position. Completed |
Evidence:
|
Infill moulding is fixed to arch soffit and reveals of opening. Completed |
Evidence:
|
Arch is stopped in accordance with job specifications and required level of finish. Completed |
Evidence:
|
Fix and stop plaster panelled ceiling.
|
|
Ceiling battens are positioned and spaced for cornice margins and flush-mounted panels. Completed |
Evidence:
|
Panels are located on ceiling, and levelled, lined up and fastened into position in accordance with approved specification. Completed |
Evidence:
|
Jointing is finished to specification. Completed |
Evidence:
|
Fix ornamental mouldings.
|
|
Ornamental mouldings are measured and cut to specification. Completed |
Evidence:
|
Ornamental mouldings are fixed by fastening or bonding with adhesive, straight and level to architect's specifications. Completed |
Evidence:
|
Mouldings are finished, including straight stoppings and finishing mitres to specification. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|