The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied. Completed |
Evidence:
|
Transfer dimensions from an engineering drawing to work.
|
|
Specifications and work requirements are determined in accordance with materials and drawings, and marking off of material is carried out to requirements for profile work to specifications. Completed |
Evidence:
|
Datum points are correctly established on stone for application of profile set-out. Completed |
Evidence:
|
Develop patterns.
|
|
Consideration of dressing procedures are analysed and most appropriate development method is chosen and applied for type of stone. Completed |
Evidence:
|
Calculations are carried out and accurately used to develop true shape of profile mould. Completed |
Evidence:
|
Patterns are set out accurately for profile mould, reverse mould and bed mould to dimensions and specified shapes. Completed |
Evidence:
|
Allowances for fabrication processes with guide/roller working off template are correctly determined and transferred to bed mould. Completed |
Evidence:
|
Use hand or hand-held power cutting tool.
|
|
Tool is adjusted for operation in consideration of application work. Completed |
Evidence:
|
Hand tool or power cutting tool is used safely and correctly to cut patterns for templates. Completed |
Evidence:
|
Materials are cut to size in accordance with drawing and job requirements, minimising wastage. Completed |
Evidence:
|
Templates are trimmed to set-out, where required, to specifications. Completed |
Evidence:
|
Shape and form stone.
|
|
Equipment is set up and adjusted to meet job requirements and standard operating procedures. Completed |
Evidence:
|
Stone is located and fixed into place on table ready for machine operation. Completed |
Evidence:
|
Appropriate cutter is set to machine to carry out initial cutting processes and cutters are changed as required during overall process. Completed |
Evidence:
|
Bed template is located and aligned with stone and machine operation to requirements of job and manufacturer specifications. Completed |
Evidence:
|
Machine is set up and operated with allowances for thickness of template and gauges. Completed |
Evidence:
|
Machine is operated and stone is shaped and formed to specifications, with material checked for accuracy against required dimensions and shape. Completed |
Evidence:
|
Clean up.
|
|
Area is cleaned to specification. Completed |
Evidence:
|
Waste material is removed and placed into job waste bins. Completed |
Evidence:
|
Tools and equipment are cleaned, inspected, maintained and stored. Completed |
Evidence:
|