NTISthis.com

Evidence Guide: CPCCST3006A - Machine stone

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCST3006A - Machine stone

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare.

  1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  3. Signage and barricade requirements are identified and implemented.
  4. Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
  5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety (OHS) requirements are followed in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signage and barricade requirements are identified and implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate stone machining equipment.

  1. Stone machining equipment is selected for the machining operation required and safely started up and shut down to standard operating procedures in accordance with manufacturer specifications.
  2. Materials and safety guards are correctly positioned, fitted and used to designed applications.
  3. Stone machining equipment is operated, monitored and adjusted to achieve specified size, shape and finish.
  4. Measurements and tolerances are checked for consistency with job requirements and specifications.
Stone machining equipment is selected for the machining operation required and safely started up and shut down to standard operating procedures in accordance with manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials and safety guards are correctly positioned, fitted and used to designed applications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stone machining equipment is operated, monitored and adjusted to achieve specified size, shape and finish.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Measurements and tolerances are checked for consistency with job requirements and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate static diamond saw.

  1. Stone is located on movable table aligned with saw blade in accordance with designed cut.
  2. Stone is fixed or secured into position on table by use of wedges or nailed timber sections to provide stability for sawing.
  3. Cutting blade is adjusted for depth of first cut in accordance with type of blade, hardness of stone and safety considerations of operator and other persons.
  4. Water is turned on for operating of machine and saw is started up and operated in accordance with manufacturer's safe working and operating procedures.
  5. Stone is moved by table movement so that blade cutting is at efficient rate without affecting designed operating revolutions of machine.
  6. Additional cuts are made by lowering saw after each cut and then cutting on return movement of table, until complete.
Stone is located on movable table aligned with saw blade in accordance with designed cut.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stone is fixed or secured into position on table by use of wedges or nailed timber sections to provide stability for sawing.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cutting blade is adjusted for depth of first cut in accordance with type of blade, hardness of stone and safety considerations of operator and other persons.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Water is turned on for operating of machine and saw is started up and operated in accordance with manufacturer's safe working and operating procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stone is moved by table movement so that blade cutting is at efficient rate without affecting designed operating revolutions of machine.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Additional cuts are made by lowering saw after each cut and then cutting on return movement of table, until complete.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate travelling beam saw.

  1. Stone is located on adjustable table and fixed into stable position, and table is adjusted to align designed cut with saw blade.
  2. Settings for operation are carried out on a digital panel designed for length of stone as well as width of blade.
  3. Blade is set to initial cut for operation and machine is switched on and automatically operated in accordance with manufacturer specifications.
Stone is located on adjustable table and fixed into stable position, and table is adjusted to align designed cut with saw blade.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Settings for operation are carried out on a digital panel designed for length of stone as well as width of blade.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Blade is set to initial cut for operation and machine is switched on and automatically operated in accordance with manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Operate multi-function cutter, grinder and polisher.

  1. Machine and equipment are set up with appropriate head/plate fitted and secured to operating spindle according to work application.
  2. Stone is fixed into location on table according to requirements for machining processes.
  3. Template is set into place, where applicable, for profile work and cutting and moulding operations.
  4. Machinery is set up with cutting head set to initial cut and aligned with template in accordance with manufacturer specifications for setting up and operation of machine.
  5. Machinery operations are carried out to machine manufacturer specifications and job processes for dressing stone to requirements.
Machine and equipment are set up with appropriate head/plate fitted and secured to operating spindle according to work application.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Stone is fixed into location on table according to requirements for machining processes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Template is set into place, where applicable, for profile work and cutting and moulding operations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machinery is set up with cutting head set to initial cut and aligned with template in accordance with manufacturer specifications for setting up and operation of machine.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machinery operations are carried out to machine manufacturer specifications and job processes for dressing stone to requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Carry out grinding and polishing.

  1. Appropriate grinding plate is selected and fitted to machine according to machine manufacturer specifications and stone surface to be cut and polished.
  2. Machine is set up for grinding operations and operated in accordance with job and machine manufacturer specifications with grinding and polishing processes carried out using appropriate changes of grit abrasive pads fitted in accordance with type of stone being finished.
  3. Machine operations are monitored and water support maintained to cutting and polishing applications.
Appropriate grinding plate is selected and fitted to machine according to machine manufacturer specifications and stone surface to be cut and polished.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machine is set up for grinding operations and operated in accordance with job and machine manufacturer specifications with grinding and polishing processes carried out using appropriate changes of grit abrasive pads fitted in accordance with type of stone being finished.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machine operations are monitored and water support maintained to cutting and polishing applications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Shut down machine operations.

  1. Machine shut-down procedures are carried out to machine manufacturer specifications.
  2. Supporting material, wedges and clamps are removed from stone and machine table.
  3. Finished or machined stone is removed carefully without damage and stored.
  4. Machine and supporting equipment and accessories are cleaned, maintained and checked for wear or deterioration in accordance with manufacturer specifications.
Machine shut-down procedures are carried out to machine manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Supporting material, wedges and clamps are removed from stone and machine table.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Finished or machined stone is removed carefully without damage and stored.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Machine and supporting equipment and accessories are cleaned, maintained and checked for wear or deterioration in accordance with manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up.

  1. Area is cleaned to specification.
  2. Waste material is removed and placed into job waste bins.
  3. Tools and equipment are cleaned, inspected, maintained and stored.
Area is cleaned to specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waste material is removed and placed into job waste bins.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment are cleaned, inspected, maintained and stored.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to cut, grind and polish to specification at least three types of stone products listed in the range statement, providing evidence of the ability to:

comply with OHS regulations applicable to workplace operations

comply with organisational policies and procedures

select and use appropriate processes, tools and equipment to carry out tasks

apply organisational quality procedures and processes within the context of setting and anchoring stone facades

demonstrate sound techniques in dressing hard and soft stone

select stone consistent with specification for material and colour

accurately set out and install fixing brackets

demonstrate safe handling practices in moving and placing stone

fix stone to position and structure

fix stone to line, level and plumb with clamps securing components

identify typical faults and problems that occur and action required to rectify them

communicate with others to ensure safe and effective workplace operations

complete stone facade to specification.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

work location for installation of stone

tools, plant and equipment appropriate to installation processes

construction materials relevant to proposed activity

appropriate documentation relevant to task.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm a reasonable inference that competency is not only verified under the particular assessment circumstance, but is able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

ability to recognise procedures, respond to change and contribute to workplace responsibilities, such as current work site environmental or sustainability frameworks or management systems

communication skills to:

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret drawings and specifications

use and interpret non-verbal communication

use language and concepts appropriate to cultural differences

interpret drawings and specifications

numeracy skills to apply measurements and calculations

planning and organisational skills to identify requirements, apply relevant resources and sequence tasks

problem solving skills to recognise and take action to rectify minor faults and problems

teamwork skills to be able to work with others to action tasks and relate to people from a range of cultural, social, ethnic backgrounds and with varying physical and mental abilities.

Required knowledge

Required knowledge for this unit is:

interpretation of drawings and specifications

job safety analysis (JSA) and safe work method statements

measuring and marking techniques relevant to stonemasonry work

methods of dressing stone

types and use of templates for stonemasonry work

types of stone and their characteristics

workplace and equipment safety requirements.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

material safety data sheets (MSDS)

memos

regulatory and legislative requirements pertaining to handling stone

relevant Australian standards

safe work procedures relating to handling stone

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Planning and preparation include:

assessment of conditions and hazards

determination of work requirements and safety plans and policies

equipment defect identification

work site inspection.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

hazard control

hazardous materials and substances

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

concealed services (water, power and gas)

lighting

restricted access barriers

traffic control

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Tools and equipment include:

brooms

brushes

clamps

hammers

jigs

measuring tapes and rules

shovels

spanners

spirit levels

squares

wedges.

Quality requirements include:

internal company quality policy and standards

manufacturer specifications

relevant regulations including Australian standards

workplace operations and procedures.

Environmental requirements include:

clean-up management

dust and noise

vibration

waste management.

Statutory and regulatory authority includes:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Stone machining equipment includes:

block squaring machines

drilling machines

frame or gang saws

Jenny Lind type polishers

multi-blade saws

multi-functional cutter, grinder and polisher (Jenny Lind type)

multi-head static polishers

planing machines

shaping machines

slab splitting machines

static diamond circular saws

travelling beam circular saws.

Machining operation includes:

bevelling

drilling

grinding

polishing

sawing.

Types of stone include:

igneous rock, including basalt (blue stone) and granite

limestone

marble

sandstone.

Cutting blades include:

carborundum

diamond.