The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. Completed |
Evidence:
|
Prepare materials for tiling application.
|
|
Floor and wall tiling materials are checked for product suitability, conformity to specification and compatibility with surface material, preparation and installation technique. Completed |
Evidence:
|
Activities for material preparation are identified from specifications, and manufacturers' or supervisor's instructions. Completed |
Evidence:
|
Material preparation is carried out to satisfy the requirements of the application process. Completed |
Evidence:
|
Prepare underlay and sheeting substrate.
|
|
Assistance with underlay preparation is provided under instructions and supervision. Completed |
Evidence:
|
Substrate surface is finished to approved surface standards with joints flush and sealed. Completed |
Evidence:
|
Prepare render substrate surface.
|
|
Surface-mounted construction units and attachments are safely detached, removed or arranged for removal from area and stored. Completed |
Evidence:
|
Substrate structure is identified and surfaces are cleaned to remove all contaminants and loose material in accordance with supervisor's instructions. Completed |
Evidence:
|
Materials for splash coat are proportioned and mixed to instructions ready for application to wet surface. Completed |
Evidence:
|
Horizontal and vertical surrounds are prepared for tiling process in accordance with type of tile and specified finish. Completed |
Evidence:
|
Materials for render coat are proportioned and mixed to instructions ready for application. Completed |
Evidence:
|
Surface is scratched, rendered, cured and dried to instructions in accordance with specifications for tile application. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|