The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. Completed |
Evidence:
|
Set out tiling job.
|
|
Area to be tiled is prepared to requirements of job specification in accordance with workplace procedures. Completed |
Evidence:
|
Tiles are checked for conformity to size, patterns, colours and characteristics in accordance with plans and specifications. Completed |
Evidence:
|
Tile work is set out to be symmetrical and balanced, and to produce minimal waste in accordance with specifications and standards. Completed |
Evidence:
|
Waterproof membrane is fitted and laid in wet areas to conform to manufacturer specifications and regulatory requirements. Completed |
Evidence:
|
Cut tiles as required.
|
|
Tiles are cut without jagged, flaid edges or damage to tile surfaces or finish, in accordance with workplace procedures and manufacturer recommendations. Completed |
Evidence:
|
Recess hole or curve is cut by hand or machine to shape and size and to specified tolerance. Completed |
Evidence:
|
Tile jolly is edged to form a mitre so that biscuit is not exposed at the joint in accordance with workplace procedures and manufacturer recommendations. Completed |
Evidence:
|
Lay and fix floor tiles.
|
|
Floor is checked for level/falls and square and membranes or underlay are installed in accordance with workplace procedures and manufacturer recommendations. Completed |
Evidence:
|
Substrate surface is prepared free from contaminants and residues to receive adhesive or screeded mortar in accordance with plans and specifications. Completed |
Evidence:
|
Tiles are checked for conformity to size, patterns, colours and characteristics in accordance with plans and specifications. Completed |
Evidence:
|
Adhesive is matched with tile and substrate material and mixed according to usage, climatic conditions and manufacturer specifications. Completed |
Evidence:
|
Cement mortar is prepared to appropriate consistency and floor is slurried and screeded to specifications. Completed |
Evidence:
|
Tiles are laid and fixed in conformance to standards and specifications, maintaining bond with joints that are uniform in size and a finished surface that is flat and smooth or to fulls. Completed |
Evidence:
|
Control joints are inserted in accordance with manufacturer specifications. Completed |
Evidence:
|
Tile treads, risers, steps and thresholds.
|
|
Step rises and goings are determined from formed concrete steps/stairs. Completed |
Evidence:
|
Steps are set out for uniform rise and make even cut on both sides of steps. Completed |
Evidence:
|
Step riser packing or render support is fixed where applicable and riser tiles are fixed to true alignment and uniform set out. Completed |
Evidence:
|
Treads infill and thresholds are fixed in line with the top edge of risers within specified tolerances. Completed |
Evidence:
|
Grout and seal tiles.
|
|
Joints are cleaned and prepared to receive grout according to manufacturer specifications. Completed |
Evidence:
|
Grout is mixed and applied in accordance with workplace and manufacturer specifications and to meet job requirements. Completed |
Evidence:
|
Tiles are cleaned and polished with dry cloth to specifications, removing all dust from surface and joints. Completed |
Evidence:
|
Tiles are sealed and protected in accordance with manufacturers' instructions and job specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|