Evidence Guide: CPCCWF3002A - Fix floor tiles

Student: __________________________________________________

Signature: _________________________________________________

Tips for gathering evidence to demonstrate your skills

The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!

From the Wiki University

 

CPCCWF3002A - Fix floor tiles

What evidence can you provide to prove your understanding of each of the following citeria?

Plan and prepare.

  1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  3. Signage and barricade requirements are identified and implemented.
  4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
  6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Safety (OHS) requirements are followed in accordance with safety plans and policies.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Signage and barricade requirements are identified and implemented.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Set out tiling job.

  1. Area to be tiled is prepared to requirements of job specification in accordance with workplace procedures.
  2. Tiles are checked for conformity to size, patterns, colours and characteristics in accordance with plans and specifications.
  3. Tile work is set out to be symmetrical and balanced, and to produce minimal waste in accordance with specifications and standards.
  4. Waterproof membrane is fitted and laid in wet areas to conform to manufacturer specifications and regulatory requirements.
Area to be tiled is prepared to requirements of job specification in accordance with workplace procedures.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tiles are checked for conformity to size, patterns, colours and characteristics in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tile work is set out to be symmetrical and balanced, and to produce minimal waste in accordance with specifications and standards.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Waterproof membrane is fitted and laid in wet areas to conform to manufacturer specifications and regulatory requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cut tiles as required.

  1. Tiles are cut without jagged, flaid edges or damage to tile surfaces or finish, in accordance with workplace procedures and manufacturer recommendations.
  2. Recess hole or curve is cut by hand or machine to shape and size and to specified tolerance.
  3. Tile jolly is edged to form a mitre so that biscuit is not exposed at the joint in accordance with workplace procedures and manufacturer recommendations.
Tiles are cut without jagged, flaid edges or damage to tile surfaces or finish, in accordance with workplace procedures and manufacturer recommendations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Recess hole or curve is cut by hand or machine to shape and size and to specified tolerance.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tile jolly is edged to form a mitre so that biscuit is not exposed at the joint in accordance with workplace procedures and manufacturer recommendations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Lay and fix floor tiles.

  1. Floor is checked for level/falls and square and membranes or underlay are installed in accordance with workplace procedures and manufacturer recommendations.
  2. Substrate surface is prepared free from contaminants and residues to receive adhesive or screeded mortar in accordance with plans and specifications.
  3. Tiles are checked for conformity to size, patterns, colours and characteristics in accordance with plans and specifications.
  4. Adhesive is matched with tile and substrate material and mixed according to usage, climatic conditions and manufacturer specifications.
  5. Cement mortar is prepared to appropriate consistency and floor is slurried and screeded to specifications.
  6. Tiles are laid and fixed in conformance to standards and specifications, maintaining bond with joints that are uniform in size and a finished surface that is flat and smooth or to fulls.
  7. Control joints are inserted in accordance with manufacturer specifications.
Floor is checked for level/falls and square and membranes or underlay are installed in accordance with workplace procedures and manufacturer recommendations.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Substrate surface is prepared free from contaminants and residues to receive adhesive or screeded mortar in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tiles are checked for conformity to size, patterns, colours and characteristics in accordance with plans and specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Adhesive is matched with tile and substrate material and mixed according to usage, climatic conditions and manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Cement mortar is prepared to appropriate consistency and floor is slurried and screeded to specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tiles are laid and fixed in conformance to standards and specifications, maintaining bond with joints that are uniform in size and a finished surface that is flat and smooth or to fulls.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Control joints are inserted in accordance with manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tile treads, risers, steps and thresholds.

  1. Step rises and goings are determined from formed concrete steps/stairs.
  2. Steps are set out for uniform rise and make even cut on both sides of steps.
  3. Step riser packing or render support is fixed where applicable and riser tiles are fixed to true alignment and uniform set out.
  4. Treads infill and thresholds are fixed in line with the top edge of risers within specified tolerances.
Step rises and goings are determined from formed concrete steps/stairs.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Steps are set out for uniform rise and make even cut on both sides of steps.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Step riser packing or render support is fixed where applicable and riser tiles are fixed to true alignment and uniform set out.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Treads infill and thresholds are fixed in line with the top edge of risers within specified tolerances.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout and seal tiles.

  1. Joints are cleaned and prepared to receive grout according to manufacturer specifications.
  2. Grout is mixed and applied in accordance with workplace and manufacturer specifications and to meet job requirements.
  3. Tiles are cleaned and polished with dry cloth to specifications, removing all dust from surface and joints.
  4. Tiles are sealed and protected in accordance with manufacturers' instructions and job specifications.
Joints are cleaned and prepared to receive grout according to manufacturer specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Grout is mixed and applied in accordance with workplace and manufacturer specifications and to meet job requirements.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tiles are cleaned and polished with dry cloth to specifications, removing all dust from surface and joints.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Tiles are sealed and protected in accordance with manufacturers' instructions and job specifications.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Clean up.

  1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.

Completed
Date:

Teacher:
Evidence:

 

 

 

 

 

 

 

Assessed

Teacher: ___________________________________ Date: _________

Signature: ________________________________________________

Comments:

 

 

 

 

 

 

 

 

Instructions to Assessors

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations

comply with organisational policies and procedures including quality requirements

safely and effectively operate and use tools, plant and equipment

communicate and work effectively and safely with others

as a minimum:

tile 4 square metres of a concrete bathroom floor using a sand and cement mortar mix

tile 4 square metres of a timber floor, laid on the diagonal with a half tile border, using adhesive

tile 4 square metres of a concrete floor with marble tiles, using adhesive

tile a minimum of three steps of 900mm width and 115mm risers and treads, including an expansion joint

ensuring:

correct identification of requirement and completion of the tiling

correct selection and use of appropriate processes, tools and equipment

completing all work to specification

compliance with regulations, standards and organisational quality procedures and processes.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

workplace location or simulated workplace

materials relevant to fixing floor tiles

hand and power tools, plant and equipment appropriate to fixing floor tiles

realistic activities covering the mandatory task requirements

specifications and work instructions.

Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Required Skills and Knowledge

Required skills

Required skills for this unit are:

communication skills to:

follow instructions

read and interpret:

documentation from a variety of sources

drawings and specifications

recognise procedures

report faults

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

written skills to record results of checks and tests and relevant work completion procedures

evaluate own actions and make judgments about performance and necessary improvements

identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials

organisational skills, including the ability to plan and set out work

respond to change and contribute to workplace responsibilities, such as current work site environmental and sustainability frameworks and management systems

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

control joints

general construction terminology

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS) and hazards associated with solvents, adhesives and cement or epoxy-based grouts

materials storage and environmentally friendly waste management

plans, drawings and specifications

plant, tools and equipment types, characteristics, uses and limitations

processes for the calculation of material requirements

quality requirements

techniques in fixing tiles to floors and step/stairs, including preparation of substrates

tiling materials, including tiles, adhesives, mortar, grouting and substrates, their qualities, characteristics, preparation, techniques, applications, limitations and finishing

workplace and equipment safety requirements.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

MSDS

memos

regulatory and legislative requirements pertaining to fixing floor tiles

relevant Australian standards

safe work procedures relating to fixing floor tiles

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Planning and preparation include:

assessment of conditions and hazards

determination of work requirements and safety plans and policies

equipment defect identification

work site inspection.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

hazard control

hazardous materials and substances

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

concealed services (water, power and gas)

lighting

traffic control

restricted access barriers

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Tools and equipment:

include:

brooms

brushes

buckets

caulking guns

cement sheet cutters

hammers

hose and water sprays

ladders

levelling equipment

lump hammers

measuring tapes and rules

mortar boards

nippers

pointed grouters

power drills

power leads

rags

rubber mallets

sanding blocks

saws

scrapers

shovels

spacers and wedges

spatulas

sponges

squares

squeegees

straight edges

stringlines

tile cutters and scribes

trowels

wet and dry diamond saws

wheelbarrows

wire brushes

wooden floats

may include:

concrete mixers

masonry drill bits

power grinders

power sanders.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications

workplace operations and procedures.

Materials include:

adhesives

caulking compounds

cement mortar (with and without additives)

grout

sealers

tiles.

Environmental requirements include:

clean-up management

dust and noise

vibration

waste management.

Types of tiles include:

ceramic

glass

granite

marble

porcelain

stone

terracotta.

Substrates include:

approved waterproof substrates

compressed FC sheeting

concrete

fibre cement underlay

rendered concrete

timber.

Tiles are fixed using:

adhesives

cement mortar

cement mortar with adhesive additive.

Grout may be:

cementitious

epoxy.