The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. Completed |
Evidence:
|
Prepare materials.
|
|
Work area for mosaic fixing is prepared for the requirements of the task. Completed |
Evidence:
|
Mosaic sheets are checked for conformity to size, pattern, colour and characteristics in accordance with plans and specifications. Completed |
Evidence:
|
Mosaic work is set out to be symmetrical, balanced and produce minimal waste in accordance with specifications and standards. Completed |
Evidence:
|
Adhesive is selected, prepared and mixed in accordance with standard work practices, manufacturer recommendations and specifications. Completed |
Evidence:
|
Prepare substrate.
|
|
Substrate surfaces are prepared for application of render. Completed |
Evidence:
|
Render is mixed to specification. Completed |
Evidence:
|
Substrate surfaces are rendered to specified thickness, standard and finish. Completed |
Evidence:
|
Surface is cleaned free of contaminants and loose material ready for tile application. Completed |
Evidence:
|
Fix mosaic to flat surfaces.
|
|
Prepared mosaic sheets or tiles are marked to identify the section of application. Completed |
Evidence:
|
Appropriate fixing medium is selected to ensure light coloured tiles are not darkened. Completed |
Evidence:
|
Fixing medium is applied to substrate and mosaic sheets or tiles are laid in accordance with manufacturer specifications, maintaining alignment to set out lines and face surface of tiles, to the specified finish. Completed |
Evidence:
|
Mosaic tiles are positioned prior to final set and adjusted to ensure the specified mosaic lines and spaces are consistent. Completed |
Evidence:
|
Surface is finished so that the face of tiles is flush and the surface is flat. Completed |
Evidence:
|
Fix mosaic to curved surfaces.
|
|
Extent of curve is established from site inspection. Completed |
Evidence:
|
Datum line is set out around wall. Completed |
Evidence:
|
Tiles are set out to determine design balance and to identify any cutting requirement. Completed |
Evidence:
|
Template is made to form the finished curve of the tiled surface. Completed |
Evidence:
|
Tile laying method is determined, and the location of the first tile is identified. Completed |
Evidence:
|
Render is mixed to specifications. Completed |
Evidence:
|
Substrate surfaces are rendered to specified thickness and finished to prepared template. Completed |
Evidence:
|
Mortar and/or adhesive is prepared to manufacturer specifications. Completed |
Evidence:
|
Tiles are fixed level, plumb, flush and square in accordance with specifications. Completed |
Evidence:
|
Horizontally laid tiles are set out to grid with perimeter tiles marked and cut to fit curve lines. Completed |
Evidence:
|
Fix mosaic to a circular column.
|
|
Surface is prepared and cleaned for render application. Completed |
Evidence:
|
Template is prepared for the diameter profile of column. Completed |
Evidence:
|
Render is mixed to specifications. Completed |
Evidence:
|
Render is applied to specified thickness and finished to prepared template. Completed |
Evidence:
|
Template is prepared for diameter profile of finished tiled face. Completed |
Evidence:
|
Mosaic sheet or tiles are fixed to column, maintaining an even spacing and plumb and level finish, to specification. Completed |
Evidence:
|
Grout tile face.
|
|
Tiled surface is cleaned free of dust and adhesive. Completed |
Evidence:
|
Oxides are selected and grout is mixed and applied to mosaic surface in accordance with manufacturer specifications and to meet job requirements. Completed |
Evidence:
|
Finished mosaic surface is cleaned and polished with dry cloth to specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|