The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. Completed |
Evidence:
|
Set out tiling job.
|
|
Levels of pool or spa are identified and established in accordance with specifications. Completed |
Evidence:
|
Size of tile to be used is determined in accordance with curvature of pool or spa. Completed |
Evidence:
|
Pool or spa surface is divided into sectional shapes involving whole tiles and cut tiles. Completed |
Evidence:
|
Sections are determined by considering sheet sizes of tiles and maintaining straight lines where possible. Completed |
Evidence:
|
Cross-centre lines are marked out on pool or spa surface. Completed |
Evidence:
|
Curved surface is set out to form regular shapes running down and through base. Completed |
Evidence:
|
Tapered sections are set out in highly curved and concave areas, whereby tiles are cut leading to and into the base. Completed |
Evidence:
|
Tile straight lines and full sheet sections of surface.
|
|
Paper patterns are marked and cut to shape of section or layout directed to prepare sheets or tiles. Completed |
Evidence:
|
Spacing is determined and adjusted to ensure minimum cutting in these sections. Completed |
Evidence:
|
Prepared sheets or tiles are marked to identify with section of application. Completed |
Evidence:
|
Specified waterproof adhesive is prepared for application to manufacturer specifications. Completed |
Evidence:
|
Tiles are laid working from coping down, maintaining parallel to cross-centre lines and regular face alignment. Completed |
Evidence:
|
Lay tiles to tapered sections.
|
|
Tapered areas are set out where applicable, to allow for full tile at top. Completed |
Evidence:
|
Tile sizes and shapes are determined and set out. Completed |
Evidence:
|
Shaped tiles are cut to designed set out and to specified tolerance. Completed |
Evidence:
|
Adhesive is applied and tiles are laid maintaining alignment to set out lines and surface of tiles. Completed |
Evidence:
|
Lay tiles to curved sections.
|
|
Template is set out and cut to ensure conformity to tile surface for curve in both dimensions. Completed |
Evidence:
|
Pad tiles are positioned accurately and fixed to line, to maintain uniform spacing and taper. Completed |
Evidence:
|
Adhesive is applied and tiles are laid maintaining alignment to template line and surface of tiles. Completed |
Evidence:
|
Tiles are fixed to walls, plumb, maintaining levels and curvature of wall in both dimensions to specifications. Completed |
Evidence:
|
Tile surface.
|
|
Tile spacings are cleaned and excess adhesive is removed from surface to receive grout. Completed |
Evidence:
|
Specified grout is mixed and applied according to manufacturer specifications. Completed |
Evidence:
|
Tiled surface is cleaned and polished with dry cloth to specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|