The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Plan and prepare.
|
|
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. Completed |
Evidence:
|
Safety (OHS) requirements are followed in accordance with safety plans and policies. Completed |
Evidence:
|
Signage and barricade requirements are identified and implemented. Completed |
Evidence:
|
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. Completed |
Evidence:
|
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. Completed |
Evidence:
|
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. Completed |
Evidence:
|
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. Completed |
Evidence:
|
Identify waterproofing system.
|
|
Area to be waterproofed is identified from a technical report or diagnosed damp fault area and inspected for defects and soundness in accordance with job and manufacturer specifications. Completed |
Evidence:
|
Area of structure for waterproofing surface application is inspected for defects and soundness in accordance with job and manufacturer specifications. Completed |
Evidence:
|
Appropriate remedial waterproofing systems and products are identified, analysed and selected in accordance with job and manufacturer specifications and with material safety data sheet (MSDS) directions. Completed |
Evidence:
|
Range of waterproofing materials is checked for product suitability, conformity to specification and compatibility with surface material, preparation and waterproofing installation technique. Completed |
Evidence:
|
Type of waterproofing material is identified in accordance with type of substrate, job specification, state of structure and job safety requirements with MSDS directions. Completed |
Evidence:
|
Prepare for waterproofing process.
|
|
Site to be repaired is confirmed to be in accordance with drawings, specifications and manufacturers' specification. Completed |
Evidence:
|
Construction/installation site is set out to specified location, structure and dimensions in accordance with drawings and specifications. Completed |
Evidence:
|
Apply waterproofing using injection.
|
|
Injection hole set-out spacings and depth are determined and measured in accordance with manufacturer recommendations. Completed |
Evidence:
|
Materials are prepared for injection method application in accordance with manufacturer recommendations. Completed |
Evidence:
|
Injection equipment is prepared and set up for injection process in accordance with manufacturer recommendations. Completed |
Evidence:
|
Injection system is tested and flushed in accordance with manufacturer specifications. Completed |
Evidence:
|
Damp course is made water resistant and capped using injection method in accordance with manufacturer recommendations and to specifications. Completed |
Evidence:
|
Apply waterproofing using hydrostatic barrier coatings.
|
|
Area to be repaired is located from job instructions, drawings and specifications. Completed |
Evidence:
|
Materials are prepared for remedial coating method application in accordance with manufacturer recommendations. Completed |
Evidence:
|
Application equipment is prepared and set up for application process in accordance with manufacturer recommendations. Completed |
Evidence:
|
Injection system is tested and flushed in accordance with manufacturer specifications. Completed |
Evidence:
|
System is connected to tubing caps and damp course is made water resistant and capped using injection method in accordance with manufacturer recommendations and to specifications. Completed |
Evidence:
|
Clean up
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. Completed |
Evidence:
|