The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Evaluate design parameters.
|
|
Client requirements are determined from plans, specifications and client briefs. Completed |
Evidence:
|
Local government, Environment Protection Authority (EPA), and Australian and New Zealand standards for the design of complex stormwater and roof drainage systems are interpreted. Completed |
Evidence:
|
Regulatory requirements for design of complex stormwater and roof drainage systems are analysed and applied. Completed |
Evidence:
|
Other documentation relevant to the design is researched, evaluated and applied. Completed |
Evidence:
|
Plan system components.
|
|
Layout of system components is planned according to design parameters and site limitations, and is coordinated with other services. Completed |
Evidence:
|
Stormwater diversion valve systems and first-flush stormwater systems are planned and evaluated. Completed |
Evidence:
|
Most suitable methods of preventing backflow of sub-soil and stormwater into buildings are determined and specified. Completed |
Evidence:
|
Treatment and disposal options for stormwater discharge are evaluated and planned. Completed |
Evidence:
|
Design and size systems.
|
|
Rainfall intensities are determined and volumes of water are estimated using measurements of different catchment areas. Completed |
Evidence:
|
Methods of collection and disposal of surface run-off water are specified. Completed |
Evidence:
|
Strategies for harvesting and re-using rainwater are identified and evaluated. Completed |
Evidence:
|
Sub-soil water types are determined and stormwater drainage systems are designed, sized and detailed using appropriate software applications. Completed |
Evidence:
|
System components are selected, designed, sized and detailed using appropriate software applications and appropriate approved materials are analysed and selected. Completed |
Evidence:
|
Stormwater systems requiring pumping are identified and designed using appropriate software applications, with pump and discharge pipe sizes calculated and specified. Completed |
Evidence:
|
Correct installation, laying and jointing procedures for materials and components are specified. Completed |
Evidence:
|
Prepare documentation.
|
|
Plans are prepared for a range of complex stormwater and roof drainage systems. Completed |
Evidence:
|
Specification for a complex stormwater and roof drainage system is prepared. Completed |
Evidence:
|
Testing and commissioning schedule is prepared. Completed |
Evidence:
|
Operation and maintenance manual is produced. Completed |
Evidence:
|