The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing stormwater and sub-soil drainage systems, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of the stormwater and sub-soil drainage system. Completed |
Evidence:
|
Determine installation requirements.
|
|
Position of installation is determined in accordance with plans, specifications and site requirements, including legal point of discharge. Completed |
Evidence:
|
Quantity and type of materials required are calculated from design drawings and specifications and comply with relevant Australian standards, local authorities' requirements and job plans and specifications. Completed |
Evidence:
|
Materials are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials are checked for compliance with docket and order form, and for acceptable condition. Completed |
Evidence:
|
Install stormwater and sub-soil drainage.
|
|
Size and location of excavation are marked out to comply with drawings and specifications, and installation and site requirements. Completed |
Evidence:
|
Site is excavated in accordance with drawings and specifications, site requirements and relevant Australian standards, ensuring minimum damage to surrounding structures or environment. Completed |
Evidence:
|
Pipework and stormwater and sub-soil drainage system are installed in accordance with drawings and specifications, site requirements or job instructions and relevant Australian standards, with consideration to existing pipework and other services. Completed |
Evidence:
|
Sustainability principles and concepts are applied to work preparation and application. Completed |
Evidence:
|
Installation is tested to comply with relevant Australian standards and relevant statutory and regulatory authorities' requirements. Completed |
Evidence:
|
Inspection openings and covers are fitted in accordance with relevant Australian standards and job specifications. Completed |
Evidence:
|
Excavation is back-filled in accordance with relevant Australian standards and job specifications. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with workplace requirements. Completed |
Evidence:
|