The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing sanitary drainage systems and workplace environmental requirements are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Tools and equipment, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of sanitary drainage systems. Completed |
Evidence:
|
Identify installation requirements.
|
|
Quantity and type of materials required are calculated from existing installations, plans, specifications and site inspections. Completed |
Evidence:
|
Allowances for fabrication and assembly are correctly determined and transferred. Completed |
Evidence:
|
Materials and equipment are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Materials and equipment are checked for compliance with standards, docket and order form, and for acceptable condition. Completed |
Evidence:
|
Install sanitary drainage systems.
|
|
Pipework is set out in accordance with drawings and specifications, site requirements or job instructions, with consideration to the location of existing services, including sewage authority utility points. Completed |
Evidence:
|
Pipework is installed in accordance with plans, specifications, standards and workplace procedures and without damage to surrounding environment, existing pipework or other services. Completed |
Evidence:
|
Connections for alterations, additions, relining or repair to existing systems are made in accordance with standards and manufacturer specifications. Completed |
Evidence:
|
Installation is checked for compliance with design drawings, specifications, site requirements, standards and authorities' requirements. Completed |
Evidence:
|
Installation is tested to comply with standards and relevant authorities' requirements. Completed |
Evidence:
|
Clean up.
|
|
Installation is backfilled in accordance with standards and work area is cleared, with materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with regulatory authorities and workplace requirements. Completed |