The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for planning.
|
|
Nature and scope of planning task are identified and confirmed. Completed |
Evidence:
|
Safety (OHS) requirements associated with installation of domestic treatment plant disposal systems and workplace environmental requirements are adhered to throughout the work. Completed |
Evidence:
|
Work is organised and sequenced in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Tools and equipment required for planning, sizing and documenting layout of domestic treatment plant disposal systems, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area in which the planning process is to be conducted is prepared. Completed |
Evidence:
|
Identify system requirements.
|
|
Information and specifications for required work are obtained and confirmed, if necessary, by site inspection. Completed |
Evidence:
|
Regulations and Australian standards relevant to work are consulted and applied to all aspects of the work. Completed |
Evidence:
|
System requirements, including capacity, method of disposal, types of system, treatment system performance requirements and processes are determined from specifications. Completed |
Evidence:
|
Information on the assessment of land capability for on-site land application of effluent are obtained and confirmed. Completed |
Evidence:
|
Information for a suitable location for the land application area and reserve area is obtained and confirmed. Completed |
Evidence:
|
System is sized in accordance with relevant Australian standards, regulatory authorities and workplace requirements. Completed |
Evidence:
|
Design system layout.
|
|
Disposal system is planned in accordance with specifications, Environment Protection Authority (EPA) and regulatory authorities' requirements, relevant Australian standards and workplace procedures. Completed |
Evidence:
|
Plans are developed to accord with relevant Australian standards, regulatory authorities' requirements, maintenance, site topography and landscape application areas. Completed |
Evidence:
|
Sustainability principles and concepts are applied to work preparation and application. Completed |
Evidence:
|
Materials required are specified and optimised in accordance with relevant Australian standards from proposed design. Completed |
Evidence:
|
Plans are recorded in accordance with statutory and regulatory authorities' and workplace requirements. Completed |
Evidence:
|
Restore work area.
|
|
Work area is restored in accordance with workplace procedures. Completed |
Evidence:
|
Tools and equipment used in the process are refurbished and left in accordance with workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation, including work backup, is completed in accordance with workplace requirements. Completed |
Evidence:
|