The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Drawings and job specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with design and installation of fire sprinkler systems, and the workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Tools, equipment and materials for the design of fire sprinkler systems, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient design of fire sprinkler systems. Completed |
Evidence:
|
Identify design requirements.
|
|
Relevant data is extracted from job specifications. Completed |
Evidence:
|
Building classification and hazard ratings are established in accordance with standards and other relevant regulations. Completed |
Evidence:
|
Water supply needs are established and graphs are drawn for the automatic fire sprinkler system. Completed |
Evidence:
|
Design sprinkler system.
|
|
Sprinkler system is designed according to job specifications, standards, manufacturer recommendations and water supply data. Completed |
Evidence:
|
Pipework is sized to manufacturer specifications, standards and pre-calculated tables. Completed |
Evidence:
|
Sprinkler heads are selected for appropriate size, spray pattern, temperature and finish. Completed |
Evidence:
|
Sprinklers are spaced in accordance with manufacturer specifications, standards and relevant regulations. Completed |
Evidence:
|
Pipe layout drawings are prepared in accordance with standards and workplace requirements. Completed |
Evidence:
|
Computations and other supporting evidence are appropriately documented to support design. Completed |
Evidence:
|
Fabrication sheets and material lists are prepared. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared, with materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with regulatory authorities and workplace requirements. Completed |
Evidence:
|