The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for work.
|
|
Plans and specifications are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing special hazard extinguishing systems and workplace environmental requirements are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements are identified and adhered to in accordance with workplace requirements. Completed |
Evidence:
|
Knowledge and understanding of ODS and SGG legislative and industry requirements are applied to install activities for special hazard fire suppression systems. Completed |
Evidence:
|
Tasks are planned and sequenced in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Tools and equipment for installing special hazard extinguishing systems, including personal protective equipment, are selected and checked for serviceability. Completed |
Evidence:
|
Work area is prepared to support efficient installation of special hazard extinguishing systems. Completed |
Evidence:
|
Identify installation requirements.
|
|
System requirements are identified from job design criteria, specifications and standards. Completed |
Evidence:
|
Components for special hazard system are selected in accordance with plans, specifications, standards, manufacturer recommendations and job requirements. Completed |
Evidence:
|
Components and other materials are identified, ordered and collected in accordance with workplace procedures. Completed |
Evidence:
|
Components are checked for compliance with standards, docket and order form, and for acceptable condition. Completed |
Evidence:
|
Decommission gaseous agent containers and actuation devices.
|
|
Gaseous agent containers and actuation devices are decommissioned according to decommissioning guidelines; organisational, customer, legislative and industry requirements; and manufacturer specifications. Completed |
Evidence:
|
All interface actuation control devices are confirmed and isolated; and appropriate signage, documentation and lock-off are put in place. Completed |
Evidence:
|
Manual, electrical and mechanical actuation control devices are disconnected. Completed |
Evidence:
|
Pneumatic actuation control devices, and pilot and slave tubes and fittings are identified and disconnected. Completed |
Evidence:
|
Transport caps on actuation outlets, plugs and locking devices are connected. Completed |
Evidence:
|
Container bank manifold connection components are disconnected. Completed |
Evidence:
|
Transport caps on valve outlets are connected. Completed |
Evidence:
|
Removal and transportation of gaseous agent containers to storage or reclaim facility are organised in accordance with legislative requirements and OHS policies and procedures. Completed |
Evidence:
|
Documentation and decommissioning sign-off requirements are completed and confirmed with relevant persons. Completed |
Evidence:
|
Install and test special hazard systems.
|
|
System is set out in accordance with drawings, specifications and job instructions. Completed |
Evidence:
|
Fixings are installed to plans and manufacturer specifications. Completed |
Evidence:
|
Pipe supports are compliant with standards, plans and specifications. Completed |
Evidence:
|
Pipes, fittings and components are installed in accordance with plans, specifications and standards. Completed |
Evidence:
|
Piping system is subjected to pressure testing in accordance with standards, plans and specifications. Completed |
Evidence:
|
Test data is recorded in format required by plans, specifications and authorities' requirements. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared, with materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with regulatory authorities and workplace requirements. Completed |
Evidence:
|