The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Identify LPG system requirements.
|
|
Plans, specifications and any special instructions are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with installing and commissioning LPG systems in caravans, mobile homes, water craft and mobile workplaces, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements for company operations are identified and adhered to. Completed |
Evidence:
|
Gas load and design requirements are determined from plans, specifications, and job drawing or workplace instructions. Completed |
Evidence:
|
System capacity is calculated to ensure adequacy for the required load and compliance with standards and workplace requirements. Completed |
Evidence:
|
Appropriate regulator and piping are identified in terms of size, connection sizes and capacity, in accordance with standards and workplace requirements. Completed |
Evidence:
|
Location of cylinders, appliances and piping set out is identified in accordance with job requirements and in compliance with standards and workplace requirements. Completed |
Evidence:
|
Quantity of piping, components and fittings are estimated in compliance with standards and workplace requirements. Completed |
Evidence:
|
Prepare for installation.
|
|
Materials, equipment, appliances and cylinders are ordered and checked for compliance with docket and order form, and for acceptable condition. Completed |
Evidence:
|
Appropriate tools and equipment for installing and commissioning LPG systems in caravans, mobile homes, water craft and mobile workplaces, including personal protective equipment, are identified and selected. Completed |
Evidence:
|
Work is planned in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Work area and materials are prepared to support efficient installation of the system. Completed |
Evidence:
|
Install LPG system, including flue and ventilation.
|
|
Cylinders, regulators, associated pipework, appliances and fixings are installed in compliance with manufacturer requirements, standards and workplace requirements. Completed |
Evidence:
|
Compliance plates are located and fitted in accordance with statutory and regulatory authority requirements, standards and workplace requirements. Completed |
Evidence:
|
Test and commission LPG system.
|
|
Appropriate test equipment is selected. Completed |
Evidence:
|
System is tested in accordance with standards and workplace requirements. Completed |
Evidence:
|
System is adjusted to provide required flow pressure in conformance to standards and workplace requirements. Completed |
Evidence:
|
Test data is recorded in format required by regulatory and workplace requirements. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with workplace requirements. Completed |
Evidence:
|