The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for purging.
|
|
Design drawing and specification are obtained. Completed |
Evidence:
|
Safety (OHS) requirements associated with purging consumer gas piping systems, and workplace environmental requirements, are adhered to throughout the work. Completed |
Evidence:
|
Quality assurance requirements for company operations are identified and adhered to. Completed |
Evidence:
|
Work is planned in conjunction with others involved in or affected by the work. Completed |
Evidence:
|
Appropriate tools and equipment for the conduct of purging, including personal protective equipment, are identified, selected and checked for serviceability. Completed |
Evidence:
|
Work area and materials are prepared to support efficient purging of consumer gas piping system. Completed |
Evidence:
|
Identify purge requirements.
|
|
Installation is checked to ensure compliance with standards and relevant specifications. Completed |
Evidence:
|
Volume of piping system is determined from design drawing and standards, and calculations are recorded in format required by job specification. Completed |
Evidence:
|
Method of purging is selected in compliance with standards and authorities' requirements. Completed |
Evidence:
|
Purge medium is selected in compliance with standards, and calculations of the purge medium volume are recorded in format required by job specification. Completed |
Evidence:
|
Carry out and test purge operation.
|
|
Outlet point for purge gas is located and purge site is checked for ignition sources. Completed |
Evidence:
|
Purge is carried out in accordance with standards or statutory and regulatory authority requirements. Completed |
Evidence:
|
Completion of purge is verified by test equipment, or by recognised and approved workplace testing procedures. Completed |
Evidence:
|
Clean up.
|
|
Work area is cleared and materials disposed of or recycled in accordance with state and territory legislation and workplace procedures. Completed |
Evidence:
|
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures. Completed |
Evidence:
|
Information is accessed and documentation completed in accordance with workplace requirements. Completed |
Evidence:
|